12-REFERANSELISTE

  1. Total E&P Norge AS “Frigg Field Cessation Plan”, 9. mai 2003

  2. Dr.techn.Olav Olsen a.s ”Brent D- Refloat feasibility study”, Rapport 10766-101, mai 09

  3. Aker Saipem “Draugen – Removal and disposal study”, Rapport DA.2.GEN.GEN/GS.T.2760.01, 15 november 97

  4. Dr.techn.Olav Olsen a.s “Removal Offshore Concrete Structures – Final report”, Rapport 2362, august 98

  5. fédération international du béton (fib) “Recycling of offshore concrete structures”, fib bulletin 18, april 2002

  6. P. Broughton og E. Andenæs “Refloat of Maureen Alpha Platform”, OTC 14226, Offshore Technology Conference 2002

  7. K. Røed, K. Karlsen og R. Davies “Maureen Refloat Project: Challenges to control weight and stability through a decommissioning project”, OTC 14227, Offshore Technology Conference 2002


15.02.2011