| NPDID wellbore: |
1975 |
| Well name: |
30/6-C-1 |
| Drilling operator name: |
Norsk Hydro Produksjon AS |
| Geodetic datum: |
ED50 |
| Coordinates: |
60° 36` 29.68`` N |
2° 46` 33.50`` E |
| UTM coordinates: |
6719332.44 N |
487733.74 E |
| UTM zone: |
31 |
| Drilled in production licence: |
053 |
| Area: |
NORTH SEA |
| Discovery: | 30/6-1 OSEBERG |
| Field: | OSEBERG |
| Drill permit: |
720-P |
| Drilling facility: | OSEBERG C |
| Production facility: | OSEBERG C |
| Predrill entry date: |
|
| Predrill completion date: |
|
| Wellbore entry date: |
01.06.1992 |
| Wellbore completion date: |
14.09.1992 |
| Multilateral wellbore: |
NO |
| Original wellbore purpose: |
INJECTION |
| Wellbore purpose: |
INJECTION |
| Wellbore status: |
INJECTING |
| Original wellbore content: |
WATER |
| Wellbore content: |
WATER |
| Discovery wellbore: |
NO |
| Seismic location: |
|
| Kelly bushing elevation (KB) [m]: |
62 |
| Water depth [m]: |
108 |
| Total depth [m]: |
6658 |
| Last updated by NPD: |
20.11.2003 |
| Note: All depths, except the water depth, are relative to kelly bushing (RKB) |