Go to the NPD's home page The NPD's Fact-pages
Go to the Fact-pages home page Comments, questions and feedback to the NPD Description of all attributes on the WDSS fact-pages Show FactMap

Generated 11.02.2012


After more than 10 years as a fact provider NPDs FactPages version 1 will be shut down in Dec. 2011.
Start using FactPages version 2 now! See also FactPages version 2 Quick Reference'
If you have any questions or comments please send an e-mail to FactWEB@npd.no.


Exploration wellbore: 2/4-18

General information

NPDID wellbore: 2134
Well name: 2/4-18
Drilling operator name: Saga Petroleum ASA
Geodetic datum: ED50
Coordinates: 56° 41` 57.72`` N 3° 9` 44.24`` E
UTM coordinates: 6284073.56 N 509938.55 E
UTM zone: 31
Drilled in production licence: 146
Area: NORTH SEA
Drill permit: 762-L
Drilling facility:TREASURE SAGA
Drilling days: 4
Wellbore entry date: 26.04.1993
Wellbore completion date: 29.04.1993
Original wellbore purpose: WILDCAT
Wellbore purpose: WILDCAT
Wellbore status: SUSP.REENTERED LATER
Wellbore contents: DRY
Discovery wellbore: NO
Seismic location: SG-9111- INLINE 1004 & CROSSLINE 1520
Kelly bushing elevation (KB) [m]: 26
Water depth [m]: 68
Total Depth (MD) [m]: 622
Final vertical depth (TVD) [m]:
Max inclination [°]:
Bottom hole temperature [°C]:
Oldest penetrated age: PLIOCENE
Oldest penetrated formation: NORDLAND GP
Note: All depths, except the water depth, are relative to kelly bushing (RKB)

Wellbore history

General

PL 146 is situated on the Hidra Terrace along the eastern margin of the Feda Graben, Southern North Sea. The first well, 2/4-14 (1988-89), penetrated an overpressuried reservoir, which was tested in an updip position by the well 2/4-16 / 2/4-16R. The latter well did not confirm the reservoir model. It was then concluded that the zone of main interest had to be situated in younger strata, preserved downdip to the east. Well 2/4-14 was sitting approximately at the pinch-out point of the untested wedge. Well 2/4-18 was drilled to test this model.

Operations and results

Well 2/4-18 was spudded with the semi-submersible installation Treasure Saga on 26 April 1993. A pilot hole was drilled to 622 m in Pliocene sediments (Nordland Group) before it had to be plugged due to hole stability problems.

No cores were cut and no wire line fluid samples taken.

Testing

No drill stem test was performed

Cuttings available at the NPD

No cuttings in this wellbore.

Cores available at the NPD

No cores in this wellbore.

Scanned core photos

No scanned core photos available

Palynological slides available at the NPD

No palynological slides in this wellbore.

Oil samples available at the NPD

No oil samples available.

Casing and leak-off tests

Type Casing diam. [inch] Depth below KB [m] Hole diam. [inch] Hole depth below KB [m] Lot mud eqv. [g/cm3]
CONDUCTOR 32 229.0 38 232.0
SURF.COND. 24 516.0 28 516.0 1.34

Mud

Depth MD [m] Mud weight [g/cm3] Visc. [MPa.s] Yield [pnt Pa.] Mud type Date measured
355 1.03 WATER BASED 1993.04.27
622 1.03 WATER BASED 1993.04.28
622 1.15 WATER BASED 1993.04.29

Drill stem test

No drill stem test in this wellbore.

Available logs

Log type Intervals logged [m]
MWD CDR 119 - 662

Lithostratigraphy

Top depth [m] Litostratigraphic unit
94 NORDLAND GP

Composite log

No composite log presently available.

Geochemical information available at the NPD

No geochemical data presently available. Regional geochemical studies which include data from this well may however be filed on a different well.

Documents reported by the licencees (period for duty of secrecy expired)

No documents presently available.



Valid HTML 4.01!