Go to the NPD's home page The NPD's Fact-pages
Go to the Fact-pages home page Comments, questions and feedback to the NPD Description of all attributes on the WDSS fact-pages Show FactMap

Generated 10.02.2012


After more than 10 years as a fact provider NPDs FactPages version 1 will be shut down in Dec. 2011.
Start using FactPages version 2 now! See also FactPages version 2 Quick Reference'
If you have any questions or comments please send an e-mail to FactWEB@npd.no.


Exploration wellbore: 1/9-3

General information

NPDID wellbore: 245
Well name: 1/9-3
Drilling operator name: Den norske stats oljeselskap a.s
Geodetic datum: ED50
Coordinates: 56° 24` 55.68`` N 2° 54` 15.22`` E
UTM coordinates: 6252464.47 N 494090.84 E
UTM zone: 31
Drilled in production licence: 044
Area: NORTH SEA
Discovery:1/9-1 TOMMELITEN ALPHA
Field:NOT YET DEVELOPED
Drill permit: 181-L
Drilling facility:DYVI GAMMA
Drilling days: 107
Wellbore entry date: 13.08.1977
Wellbore completion date: 27.11.1977
Original wellbore purpose: WILDCAT
Wellbore purpose: APPRAISAL
Wellbore status: SUSP.REENTERED LATER
Wellbore contents: DRY
Discovery wellbore: NO
Seismic location: line no 404-404&SP476
Kelly bushing elevation (KB) [m]: 36
Water depth [m]: 77
Total Depth (MD) [m]: 2771
Final vertical depth (TVD) [m]: 2771
Max inclination [°]: .75
Bottom hole temperature [°C]: 116
Oldest penetrated age: EOCENE
Oldest penetrated formation: HORDALAND GP
Note: All depths, except the water depth, are relative to kelly bushing (RKB)

Wellbore history

General

Well 1/9-3 is located in the Feda Graben, close to the UK border southwest in the Norwegian North Sea. The primary objective of the well was to evaluate the Jurassic sandstones. The secondary objective was to appraise and test the hydrocarbon bearing zones of Danian and Maastrichtian age (Shetland Group) encountered in 1/9-1. The well was drilled in two phases, of which Phase I is well bore 1/9-3 and Phase II is well bore 1/9-3 R. This procedure was a requirement from the Norwegian Petroleum Directorate since Dyvi Gamma came directly from the yard and had therefore not accumulated the experience needed to drill the high pressure Jurassic well to a planned TD of 5000 m. Phase II was to be drilled with the rig Dyvi Beta.

Operations and results

Wildcat well was spudded with the semi-submersible installation Dyvi Gamma on 13 August 1977 and drilled to TD at 27871 m in the Hordaland Group. The progress of the drilling was very much delayed due to technical problems on Dyvi Gamma. As a result, also hole problems were increased due to very long exposure in open hole condition. Due to these problems the well bore was terminated after setting the 13 3/8" casing instead of the plan, which was to drill down to the 9 5/8" casing point. The well was drilled with seawater and gel all through.

Several thin sand beds were penetrated in the Hordaland Group between 1610 m and 1737 m. Oil shows were recorded in the uppermost of these, from 1610 m to 1625 m.

No cores were cut and no wire line fluid samples taken in the well bore.

The well was suspended as dry on 27 November 1977.

Testing

No drill stem test was performed

Cuttings available at the NPD

Interval [m]: 170.00 - 4569.00

Cores available at the NPD

No cores in this wellbore.

Scanned core photos

No scanned core photos available

Palynological slides available at the NPD

Oil samples available at the NPD

Test type: Bottle test number: Bottle interval [m]: Fluid type: Test date and time:
DST TEST3 3125.000 - 3126.000 1978.09.14 00:00
DST TEST4 3112.000 - 3094.000 1978.09.19 00:02

Casing and leak-off tests

Type Casing diam. [inch] Depth below KB [m] Hole diam. [inch] Hole depth below KB [m] Lot mud eqv. [g/cm3]
CONDUCTOR 36 163.0 44 170.0
SURF.COND. 20 434.0 26 445.0
INTERM. 16 1345.0 19 1/2 1360.0
INTERM. 13 3/8 2761.0 17 1/2 2782.0

Mud

Depth MD [m] Mud weight [g/cm3] Visc. [MPa.s] Yield [pnt Pa.] Mud type Date measured
169 1.04 120.0 spud mud
445 1.07 53.0 spud mud
621 1.37 48.0 gel mud
979 1.37 48.0 gel mud
1313 1.41 48.0 gel mud
1529 1.74 57.0 gel mud
2251 1.89 53.0 gel mud
2448 1.85 52.0 gel mud
2773 1.85 56.0 gel mud

Drill stem test (intervals and pressures)

Test no. Test interval [m] Choke size [mm] Final shut in pressure [MPa] Final flow pressure [MPa] Bottom hole pressure [MPa] Downhole temperature [°C]
1.0 3205 - 3214 19.0 0
2.0 3157 - 3180 9.5 0
3.0 3126 - 3125 0
4.0 3094 - 3112 19.0 0

Drill Stem Test (recovery)

Test no. Oil [Sm3/day] Gas [Sm3/day] Oil grav. [g/cm3] Gas grav. rel.air GOR [m3/m3]
1.0 0 0 0
2.0 8 480000 .840 0
3.0 0 0 0
4.0 397 6484000 .770 0

Available logs

Log type Intervals logged [m]
IEL BHC AC GR SP 164 - 4209
IEL GR SP 3822 - 4561
BHC AC 3822 - 4559
CDL GR CAL 394 - 2771
CDL GR CAL 3822 - 4563
CDL CNL GR CAL 2730 - 4209
CNL GR 425 - 1350
CNL GR 3823 - 4562
DLL 3062 - 3350
DIP 3820 - 4564
AC CBL 300 - 1345
AC CBL 280 - 1454
AC CBL 1200 - 2760
AC CBL 220 - 3822
FDL 3050 - 3350

Lithostratigraphy

Top depth [m] Litostratigraphic unit
111 NORDLAND GP
1150 HORDALAND GP
1617 NO FORMAL NAME
1634 NO FORMAL NAME
1664 NO FORMAL NAME
1683 NO FORMAL NAME

Composite log

No composite log presently available.

Geochemical information available at the NPD

No geochemical data presently available. Regional geochemical studies which include data from this well may however be filed on a different well.

Documents reported by the licencees (period for duty of secrecy expired)

1_9_3_Completion_Report_and_Completion_log (Format:PDF. Size: 28.564 Mb )
9_3_Biostrat_of_180-2773m (Format:PDF. Size: 7.848 Mb )
9_3_Biostrat_report_3834-4569m (Format:PDF. Size: 4.535 Mb )
9_3_Biostratigrapy_of_the_interval_2278m-4570m (Format:PDF. Size: 4.117 Mb )
9_3_Chemical_Analysis_of_Water_Gas_and_Oil (Format:PDF. Size: 0.787 Mb )
9_3_Core_Report (Format:PDF. Size: 2.957 Mb )
9_3_Daily_Drilling_Report (Format:PDF. Size: 10.732 Mb )
9_3_Diplog_Results (Format:PDF. Size: 8.144 Mb )
9_3_Drilling_Mud_Operation (Format:PDF. Size: 2.713 Mb )
9_3_Estimated_pore_pressure_and_fracture_gradient (Format:PDF. Size: 3.260 Mb )
9_3_Formation_Pressure_Final_Report (Format:PDF. Size: 6.798 Mb )
9_3_Geological_Prognosis (Format:PDF. Size: 2.541 Mb )
9_3_Petrophysical_Evaluation (Format:PDF. Size: 1.167 Mb )
9_3_Petrophysical_Evaluation_Encl1 (Format:PDF. Size: 0.626 Mb )
9_3_Phase2_Drilling_programme (Format:PDF. Size: 1.089 Mb )
9_3_Phase2_Well_Prognosis_Sheet_Enc_1 (Format:PDF. Size: 0.136 Mb )
9_3_Preliminary_Formation_Evaluation (Format:PDF. Size: 0.498 Mb )
9_3_Preliminary_Formation_Evaluation_Encl1 (Format:PDF. Size: 0.626 Mb )
9_3_Pressure_Gradient_Calculations (Format:PDF. Size: 3.099 Mb )
9_3_R_Biostrat_of_2778-4570m (Format:PDF. Size: 4.117 Mb )
9_3_R_Special_Core_Analysis_Report (Format:PDF. Size: 2.487 Mb )
9_3_Report_on_a_geochem_eval (Format:PDF. Size: 6.893 Mb )
9_3_Reservoir_Fluid_Study_DST4 (Format:PDF. Size: 0.523 Mb )
9_3_Sonic_Calibration (Format:PDF. Size: 0.996 Mb )
9_3_Sonic_Calibration_Enc_01 (Format:PDF. Size: 3.257 Mb )
9_3_Sonic_Calibration_Enc_02 (Format:PDF. Size: 2.778 Mb )
9_3_Sonic_Calibration_Enc_03 (Format:PDF. Size: 11.959 Mb )
9_3_Sonic_Calibration_Enc_1 (Format:PDF. Size: 0.007 Mb )
9_3_Test_Report (Format:PDF. Size: 4.205 Mb )
9_3_Well_Prognosis_Sheet (Format:PDF. Size: 0.352 Mb )
9_3_Well_Testing_Report_Annexes (Format:PDF. Size: 5.726 Mb )
9_3_Well_Testing_Report_Flopetrol (Format:PDF. Size: 3.471 Mb )
9_3_prod_testing (Format:PDF. Size: 1.547 Mb )
9_3_wellog_services (Format:PDF. Size: 0.832 Mb )
Arcrobat reader

You need an ACROBAT reader from ADOBE  to display the reports in pdf format.

Old NPD WDSS reports, NPD papers and other related documents

WDSS_General_Information (Format:PDF. Size: 0.414 Mb )
WDSS_lithlog (Format:PDF. Size: 0.075 Mb )
Arcrobat reader

You need an ACROBAT reader from ADOBE  to display the reports in pdf format.



Valid HTML 4.01!