Go to the NPD's home page The NPD's Fact-pages
Go to the Fact-pages home page Comments, questions and feedback to the NPD Description of all attributes on the WDSS fact-pages Show FactMap

Generated 11.02.2012


After more than 10 years as a fact provider NPDs FactPages version 1 will be shut down in Dec. 2011.
Start using FactPages version 2 now! See also FactPages version 2 Quick Reference'
If you have any questions or comments please send an e-mail to FactWEB@npd.no.


Exploration wellbore: 33/9-18 A

General information

NPDID wellbore: 2455
Well name: 33/9-18
Drilling operator name: Den norske stats oljeselskap a.s
Geodetic datum: ED50
Coordinates: 61° 15` 40.78`` N 1° 56` 07.73`` E
UTM coordinates: 6792522.53 N 442897.08 E
UTM zone: 31
Drilled in production licence: 037
Area: NORTH SEA
Drill permit: 800-L
Drilling facility:DEEPSEA BERGEN
Drilling days: 35
Wellbore entry date: 21.12.1994
Wellbore completion date: 24.01.1995
Original wellbore purpose: WILDCAT
Wellbore purpose: WILDCAT
Wellbore status: P&A
Wellbore contents: DRY
Discovery wellbore: NO
Seismic location: CTM 94-3D: INLINE 1127 & CROSSLINE 492
Kelly bushing elevation (KB) [m]: 23
Water depth [m]: 145
Total Depth (MD) [m]: 3595
Final vertical depth (TVD) [m]: 3195
Max inclination [°]:
Bottom hole temperature [°C]: 100
Oldest penetrated age: LATE JURASSIC
Oldest penetrated formation: DRAUPNE FM
Note: All depths, except the water depth, are relative to kelly bushing (RKB)

Wellbore history

General

Well 33/9-18 A was drilled to a structure situated east of the Statfjord Field and south-west of the Tordis Field. The main objective of well 33/9-18 A was to test the lithology of a strong seismic amplitude within the same prospect as drilled in well 33/9-18. Well 33/9-18 A is a sidetrack from well 33/9-18.

Operations and results

Exploration well 33/9-18 A was spudded on 21 December 1994 with the semi-submersible installation Deepsea Bergen and drilled from kick-off at 1974 m to TD at 3597 m in the Late Jurassic Draupne Formation. The 12 1/4" hole section was drilled with KC1/PAC POLYMER and KCl mud system to prevent bit balling. No shallow gas was recorded.

Parts of the 12 1/4" section have anomalous resistivity data. The MWD data records from 3070 m to TD are missing, due to washout, lost signal, stuck pipe and MWD tool lost in hole. No wireline logging was performed. 1 core was cut in the Draupne Formation the interval 3397-3404.5 m. No fluid samples were collected. Bit balling was observed several times and a lot of pills were pumped to prevent balling, but minor effects were observed. Dyno-CC-115 (soap) pills showed best results. Drilling from 3145 m to 3397 m had to stop after 49 m due to bad weather. Drilling continued after 7 days stop and the flow rate was increased to maintain a pressure of 280 bar. At TD the actual pressure was nearly 100 bar less than the "theoretical" pressure. This pressure drop was caused by wash out between two drill collars. Got differential stuck at 3512 m when pulling out of the hole. Cut the string at 3382 m to get free. Extra cost related to logistics is estimated to approximately 3.3 mill. NOK. The well was plugged and abandoned after being stuck for 83.5 hrs.

The well has been interpreted to penetrate large slump/slide blocks consisting of the Brent Group, the Dunlin Group and the Statfjord Formation which are deposited within the Draupne Formation. The strong seismic amplitude within the sidetrack 33/9-18 A was penetrated. The amplitude was represented by occasional water wet sandstone and hard shales. No hydrocarbon shows were observed in the well.

The well 33/9-18 A was permanently plugged and abandoned as a dry well on 24 January 1995.

Testing

No drill stem test was performed

Cuttings available at the NPD

Interval [m]: 1980.00 - 3595.00

Cores available at the NPD

Core length [m]: 6.00

Core number Interval
1 3397.00-3403.05

Scanned core photos

Click to view photo in full size
3397-3402m
Click to view photo in full size
3402-3403m

Palynological slides available at the NPD

Oil samples available at the NPD

No oil samples available.

Casing and leak-off tests

Type Casing diam. [inch] Depth below KB [m] Hole diam. [inch] Hole depth below KB [m] Lot mud eqv. [g/cm3]
CONDUCTOR 30 229.0 36 230.0
INTERM. 20 753.0 26 755.0 1.49
INTERM. 13 3/8 1951.0 17 1/2 1953.0 1.96
OPEN HOLE 3595.0 12 1/4 3595.0

Mud

Depth MD [m] Mud weight [g/cm3] Visc. [MPa.s] Yield [pnt Pa.] Mud type Date measured
200 1.03 29.0 18.5 WATER BASED 1995.01.25
500 1.49 29.0 18.5 WATER BASED 1995.01.23
500 1.49 29.0 18.5 WATER BASED 1995.01.23
1900 1.55 32.0 11.5 WATER BASED 1994.12.23
2060 1.62 45.0 20.0 WATER BASED 1994.12.23
2235 1.62 45.0 20.0 WATER BASED 1994.12.28
2285 1.62 45.0 20.0 WATER BASED 1994.12.28
2315 1.60 45.0 20.0 WATER BASED 1994.12.28
2403 1.60 45.0 20.0 WATER BASED 1994.12.28
2549 1.60 45.0 20.0 WATER BASED 1994.12.28
2621 1.62 45.0 20.0 WATER BASED 1994.12.28
2795 1.63 45.0 20.0 WATER BASED 1994.12.29
2992 1.63 32.0 15.0 WATER BASED 1995.01.02
3145 1.63 34.0 16.5 WATER BASED 1995.01.03
3194 1.63 32.0 15.0 WATER BASED 1995.01.03
3194 1.63 30.0 13.0 WATER BASED 1995.01.03
3194 1.63 30.0 13.0 WATER BASED 1995.01.03
3194 1.63 30.0 16.0 WATER BASED 1995.01.05
3194 1.63 30.0 15.5 WATER BASED 1995.01.10
3194 1.63 31.0 15.5 WATER BASED 1995.01.10
3194 1.63 31.0 15.5 WATER BASED 1995.01.10
3194 1.63 30.0 13.0 WATER BASED 1995.01.05
3200 1.63 32.0 15.0 WATER BASED 1995.01.10
3200 1.63 30.0 18.0 WATER BASED 1995.01.10
3200 1.63 30.0 15.5 WATER BASED 1995.01.12
3200 1.63 32.0 17.0 WATER BASED 1995.01.12
3200 1.63 31.0 18.0 WATER BASED 1995.01.13
3200 1.63 30.0 16.0 WATER BASED 1995.01.16
3200 1.63 29.0 18.5 WATER BASED 1995.01.16
3200 1.63 29.0 18.0 WATER BASED 1995.01.17
3200 1.63 30.0 19.0 WATER BASED 1995.01.18
3200 1.63 29.0 18.5 WATER BASED 1995.01.20
3200 1.63 29.0 18.5 WATER BASED 1995.01.20
3200 1.63 29.0 18.5 WATER BASED 1995.01.23
3200 1.63 29.0 18.0 WATER BASED 1995.01.16
3252 1.63 32.0 15.0 WATER BASED 1995.01.10
3397 1.63 30.0 18.0 WATER BASED 1995.01.10
3404 1.63 32.0 17.0 WATER BASED 1995.01.12
3404 1.63 30.0 15.5 WATER BASED 1995.01.12
3457 1.63 31.0 18.0 WATER BASED 1995.01.13
3553 1.63 30.0 16.0 WATER BASED 1995.01.16
3597 1.63 29.0 18.5 WATER BASED 1995.01.16
3597 1.63 29.0 18.0 WATER BASED 1995.01.16
3597 1.63 30.0 19.0 WATER BASED 1995.01.18
3597 1.63 29.0 18.5 WATER BASED 1995.01.20
3597 1.63 29.0 18.5 WATER BASED 1995.01.20
3597 1.63 29.0 18.0 WATER BASED 1995.01.17
3597 1.63 29.0 18.5 WATER BASED 1995.01.23

Drill stem test

No drill stem test in this wellbore.

Available logs

Log type Intervals logged [m]
MWD - RGD 1974 - 3597

Lithostratigraphy

Top depth [m] Litostratigraphic unit
168 NORDLAND GP
840 UTSIRA FM
1028 HORDALAND GP
1729 ROGALAND GP
1729 BALDER FM
1767 LISTA FM
1933 SHETLAND GP
1933 JORSALFARE FM
2230 KYRRE FM
2996 TRYGGVASON FM
3190 CROMER KNOLL GP
3190 MIME FM
3200 VIKING GP
3200 DRAUPNE FM

Composite log

Composite log (Format:PDF. Size: 0.098 Mb)


Arcrobat reader

You need an ACROBAT reader from ADOBE  to display the reports in pdf format.

Geochemical information

File 1 (Format:PDF. Size: 0.937 Mb )
Arcrobat reader

You need an ACROBAT reader from ADOBE  to display the reports in pdf format.

Documents reported by the licencees (period for duty of secrecy expired)

No documents presently available.



Valid HTML 4.01!