Go to the NPD's home page The NPD's Fact-pages
Go to the Fact-pages home page Comments, questions and feedback to the NPD Description of all attributes on the WDSS fact-pages Show FactMap

Generated 11.02.2012


After more than 10 years as a fact provider NPDs FactPages version 1 will be shut down in Dec. 2011.
Start using FactPages version 2 now! See also FactPages version 2 Quick Reference'
If you have any questions or comments please send an e-mail to FactWEB@npd.no.


Exploration wellbore: 34/7-26 SR

General information

NPDID wellbore: 3315
Well name: 34/7-26
Drilling operator name: Saga Petroleum ASA
Geodetic datum: ED50
Coordinates: 61° 16` 29.38`` N 2° 7` 11.41`` E
UTM coordinates: 6793879.09 N 452806.07 E
UTM zone: 31
Drilled in production licence: 089
Area: NORTH SEA
Discovery:34/7-21 BORG
Field:TORDIS
Drill permit: 902-L2
Drilling facility:SCARABEO 5
Drilling days: 26
Wellbore entry date: 08.01.1998
Wellbore completion date: 02.02.1998
Reentry activity:DRILLING/PLUGGING
Original wellbore purpose: APPRAISAL
Wellbore purpose: APPRAISAL
Wellbore status: RE-CLASS TO TEST
Wellbore contents: OIL
Discovery wellbore: NO
Formation/age with hydrocarbons 1:NO FORMAL NAME / EARLY CRETACEOUS
Formation/age with hydrocarbons 2:INTRA DRAUPNE FM SS / LATE JURASSIC
Seismic location:
Kelly bushing elevation (KB) [m]: 25
Water depth [m]: 201
Total Depth (MD) [m]: 4690
Final vertical depth (TVD) [m]: 2658
Max inclination [°]: 59.00
Bottom hole temperature [°C]:
Oldest penetrated age: MIDDLE JURASSIC
Oldest penetrated formation: HEATHER FM
Note: All depths, except the water depth, are relative to kelly bushing (RKB)

Wellbore history

General

Appraisal well 34/7-26 SR is located in the Tampen area in the Northern North Sea. It is a re-entry of well 34/7-26 S, which was suspended when the rig was needed for clean up work on well 34/7-B-2 H. The well had two primary objectives. Firstly, to perform an optimum data collection programme in the Top Draupne sandstone and in lower Shetland Group sands if these were present. Secondly, if there was thick and good quality Top Draupne sands present, the well was to be long-termed tested for six months to the Gullfaks-C Platform.

Operations and results

Well 34/7-26 S was re-entered (34/7-26 SR) on 2 February 1998 through slot J-3 on Tordis Extension Template, approximately 2500 m south of the discovery well 34/7-21. The well was drilled with the semi-submersible installation Scarabeo 5. New Formation was drilled from below the 9 5/8" casing shoe at 4193 m in the primary well bore to final TD at 4690 m (2657.6 m TVD) in Middle Jurassic sediments of the Heather Formation. Inclination dropped from 59 to 20 deg in about 300 m. There were no particular problems with drilling, but the wire line logging programme was cancelled. Probably due to a severe rat hole below the 9 5/8" casing shoe, it was not possible to get any wire line logging tools into the open hole section. The well bore was drilled all through to TD with a pseudo oil based mud (Ancotec with Novamul).

The Top Cromer Knoll Group was penetrated at 4505 m (2480 m TVD), and consisted of the Rødby Formation from 4505 m to 4512 m and the Mime Formation from 4512 to 4528 m (2486 to 2502 m TVD). Two thin sandstones (approx. 1 and 2 m TVD) were encountered within the Mime Formation. The upper sandstone was grey in colour and bioturbated. The sandstone was dated to the Turonian-Coniacian stage. The lower sandstone exhibited a brown colour, and was bioturbated in the lower part. The lower sandstone was dated to the Middle Albian - early Late Albian stage. Both of the sands exhibited fluorescence. From log analysis, the sands exhibited good porosities, but had low permeabilities due to extensive cementation.

The main reservoir interval, the Intra Draupne Formation sand, came in at (4528 m (2502 m TVD), 24 m TVD shallower than prognosed. The gross thickness of the reservoir was approximately 9 m MD, compared to the prognosed thickness of 35 - 40 m. Net/gross ratio in the reservoir was 70%, average porosity 17.6%, average horizontal permeability 54 mD (from core), and average water saturation 39% (values derived from MWD-logs). Total thickness of the underlying Draupne Formation shale section was 75 m TVD. The Intra Draupne Formation reservoir consisted of bedded dark grey to black sandstones in a background of "allochtonous" black shales. Some lenticular bedding was distinguished in the core. The section was none to weakly bioturbated. The sands exhibited fluorescence. Interpreted from the logs, the best part of the reservoir was in the upper two meters. This section was unfortunately not covered by core.

From the analysis of the logs and the results from the core analysis, it was decided that the criteria for test production were not fulfilled. It was decided to drill a side-track well (34/7-26A) in a position closer to the 34/7-21 well.

No oil water contact was encountered in the well. The deepest oil down-to was observed at approximately 4543 m (2516 m TVD) in the Draupne Formation.

Coring was commenced at 4510 m, 20 m MD above estimated BCU depth. Core #1 jammed after 23 m, and only the upper 10.9 m was recovered. Core #2 started at 4533 m and ended at 4599 m. A total measured thickness of 76.9 m core was recovered. No wire line logs were run and no fluid samples were taken.

The well was plugged back and suspended on 2 February 1998 as an oil appraisal. Since the criteria for a test was not met it was decided side-track well for the test (34/7-26 A), in a position closer to the 34/7-21 well.

Testing

No drill stem test was performed.

Cuttings available at the NPD

Interval [m]: 4200.00 - 4689.00

Cores available at the NPD

Core length [m]: 76.00

Core number Interval
1 4510-4521
2 4534-4599

Scanned core photos

Click to view photo in full size
4510-4515m
Click to view photo in full size
4515-4520m
Click to view photo in full size
4520-4521m
Click to view photo in full size
4533-4538m
Click to view photo in full size
4538-4543m
Click to view photo in full size
4543-4548m
Click to view photo in full size
4548-4553m
Click to view photo in full size
4553-4558m
Click to view photo in full size
4558-4563m
Click to view photo in full size
4563-4568m
Click to view photo in full size
4568-4573m
Click to view photo in full size
4573-4578m
Click to view photo in full size
4578-4583m
Click to view photo in full size
4583-4588m
Click to view photo in full size
4588-4593m
Click to view photo in full size
4593-4598m
Click to view photo in full size
4598-4599m

Palynological slides available at the NPD

Oil samples available at the NPD

No oil samples available.

Casing and leak-off tests

Type Casing diam. [inch] Depth below KB [m] Hole diam. [inch] Hole depth below KB [m] Lot mud eqv. [g/cm3]
INTERM. 9 5/8 4181.0 12 1/4 4183.0
OPEN HOLE 4690.0 8 1/2 4690.0

Mud

No mud data available.

Drill stem test

No drill stem test in this wellbore.

Available logs

Log type Intervals logged [m]
MWD - GR RES DIR 4173 - 4684
MWD - TC SONIC 4173 - 4684

Lithostratigraphy

Top depth [m] Litostratigraphic unit
226 NORDLAND GP
1002 UTSIRA FM
1348 HORDALAND GP
1555 NO FORMAL NAME
1617 NO FORMAL NAME
1665 NO FORMAL NAME
1867 NO FORMAL NAME
1980 NO FORMAL NAME
2098 NO FORMAL NAME
2187 NO FORMAL NAME
2223 NO FORMAL NAME
2896 ROGALAND GP
2896 BALDER FM
3016 LISTA FM
3340 SHETLAND GP
3340 JORSALFARE FM
3866 KYRRE FM
4505 CROMER KNOLL GP
4505 RØDBY FM
4512 MIME FM
4528 VIKING GP
4528 INTRA DRAUPNE FM SS
4537 DRAUPNE FM
4610 HEATHER FM

Composite log

No composite log presently available.

Geochemical information

File 1 (Format:PDF. Size: 0.176 Mb )
File 2 (Format:PDF. Size: 5.897 Mb )
Arcrobat reader

You need an ACROBAT reader from ADOBE  to display the reports in pdf format.

Documents reported by the licencees (period for duty of secrecy expired)

No documents presently available.



Valid HTML 4.01!