Go to the NPD's home page The NPD's Fact-pages
Go to the Fact-pages home page Comments, questions and feedback to the NPD Description of all attributes on the WDSS fact-pages Show FactMap

Generated 11.02.2012


After more than 10 years as a fact provider NPDs FactPages version 1 will be shut down in Dec. 2011.
Start using FactPages version 2 now! See also FactPages version 2 Quick Reference'
If you have any questions or comments please send an e-mail to FactWEB@npd.no.


Exploration wellbore: 1/3-9 S

General information

NPDID wellbore: 3362
Well name: 1/3-9
Drilling operator name: BP Norway Limited U.A.
Geodetic datum: ED50
Coordinates: 56° 58` 57.97`` N 2° 57` 31.33`` E
UTM coordinates: 6315610.11 N 497490.00 E
UTM zone: 31
Drilled in production licence: 065
Area: NORTH SEA
Discovery:1/3-3 TAMBAR
Field:TAMBAR
Drill permit: 928-L
Drilling facility:MÆRSK JUTLANDER
Drilling days: 85
Wellbore entry date: 08.05.1998
Wellbore completion date: 31.07.1998
Original wellbore purpose: APPRAISAL
Wellbore purpose: APPRAISAL
Wellbore status: RE-CLASS TO DEV (1/3-K-1)
Wellbore contents: OIL
Discovery wellbore: NO
Formation/age with hydrocarbons 1:ULA FM / LATE JURASSIC
Seismic location: BPNHR97-13 X-OVER BPNHR97-22
Kelly bushing elevation (KB) [m]: 23
Water depth [m]: 68
Total Depth (MD) [m]: 4516
Final vertical depth (TVD) [m]: 4359
Max inclination [°]: 25.90
Bottom hole temperature [°C]: 168
Oldest penetrated age: LATE JURASSIC
Oldest penetrated formation: ULA FM
Note: All depths, except the water depth, are relative to kelly bushing (RKB)

Wellbore history

General

Well 1/3-9 S is located on the Tambar Field on the Cod Terrace in the North Sea. The objective was to appraise the possibility of commercial quantities of hydrocarbons in the Ula Formation sandstones of the JU8 prospect (the Ula Formation is sometimes referred to as the "Gyda Sandstone Member" in this part of the North Sea). The well was planned deviated to avoid shallow gas anomalies and to fully appraise the target sand.

Operations and results

Well 1/3-9 S was spudded with the semi-submersible installation M&rsk Jutlander on 8 May 1998 and drilled to 3100 m where hole problems led to plug-back and a sidetrack (1/3-9 S T2) with kick-off at 1836 m. Final TD of the well was set at 4516 m in the Late Jurassic Ula Formation. The well was drilled with seawater and hi-vis pills down to 1050 m, with Barasilc WBM from 1050 m to 3185 m, and with Enviromul OBM from 3185 m to TD. Total Non-Productive time for the well was 40%, most of which was due to contamination of the mud system, the side-track of the well and the TD logging performance. The 12 1/4" Section was notably different from plan, after an unexpected water kick was taken at 2535 m. This not only reduced the mud systems ability to accept contaminants, with a required MW increase up to 1.7sg, but also severely reduced the ROP, due to high overbalance drilling, later in the section. This also resulted in setting the 9 5/8" casing high, leaving reactive shales open whilst drilling the 8 1/2" section.

The Palaeocene Forties sands of the 1/3-6 and 1/3-7 wells were not encountered.The target Ula Formation sandstone was encountered at 4266.3 m, 33.7 m high to prognosis. It was oil-bearing with an estimated OWC at ca 4375 m. Oil shows, both fluorescence in cuttings samples and drilled gas with the compositional range of C1 - C5, were observed through the interval 4273 - 4377 m, within this unit. No other shows were recorded in the well. Analysis of MDT pressure revealed a 550 psi difference compared to well 1/3-3 and Gyda well 2/1-6. This is interpreted as being a result of depletion from Gyda oil production, and suggests there is significant communication through the aquifer between the JU8 structure and the Gyda Field.

A total of 105 m of core was cut in two cores in the Ula Formation. A total recovery of 99.7% was obtained, representing the two longest core recoveries in the area. MDT oil samples were taken at 4279.5 m, 4304.98 m, and at 4346.49 m. Following extensive logging of the well, a 7" liner was run in preparation for future development. The well was temporarily suspended on 31 July 1998, with a combined trawl guard and corrosion cap left on top. In June 2001 it was re-entered and reclassified to development well on the Tambar and Tambar &st Fields.

Well 1/3-9 S is classified as an appraisal of the 1/3-3 Tambar Discovery.

Testing

No drill stem test was performed.

Cuttings available at the NPD

Interval [m]: 1070.00 - 3100.00

Cores available at the NPD

Core length [m]: 104.80

Core number Interval
1 4273.00-4322.70
2 4323.00-4378.12

Scanned core photos

Click to view photo in full size
4273-4278m
Click to view photo in full size
4278-4283m
Click to view photo in full size
4283-4288m
Click to view photo in full size
4288-4293m
Click to view photo in full size
4293-4298m
Click to view photo in full size
4298-4303m
Click to view photo in full size
4303-4308m
Click to view photo in full size
4308-4313m
Click to view photo in full size
4313-4318m
Click to view photo in full size
4318-4322m
Click to view photo in full size
4323-4328m
Click to view photo in full size
4328-4333m
Click to view photo in full size
4333-4338m
Click to view photo in full size
4338-4343m
Click to view photo in full size
4343-4348m
Click to view photo in full size
4348-4353m
Click to view photo in full size
4353-4358m
Click to view photo in full size
4358-4363m
Click to view photo in full size
4368-4373m
Click to view photo in full size
4373-4378m
Click to view photo in full size
4378-4378m

Palynological slides available at the NPD

No palynological slides in this wellbore.

Oil samples available at the NPD

No oil samples available.

Casing and leak-off tests

Type Casing diam. [inch] Depth below KB [m] Hole diam. [inch] Hole depth below KB [m] Lot mud eqv. [g/cm3]
CONDUCTOR 30 159.0 36 165.0
SURF.COND. 13 3/8 1042.0 17 1/2 1050.0 1.98
PILOT HOLE 1050.0 9 7/8
INTERM. 9 5/8 3180.0 12 174 3185.0 1.90
LINER 7 4514.0 8 1/2 4516.0

Mud

Depth MD [m] Mud weight [g/cm3] Visc. [MPa.s] Yield [pnt Pa.] Mud type Date measured
160 1.03 1.0 WATERBASED
501 1.03 1.0 WATERBASED
1050 1.25 1.0 WATER BASED MUD
1658 1.30 16.0 WATER BASED MUD
1920 1.70 25.0 WATER BASED MUD
2180 1.70 26.0 WATER BASED MUD
2293 1.70 26.0 WATER BASED MUD
2348 1.70 26.0 WATER BASED MUD
2515 1.70 24.0 WATER BASED MUD
2932 1.67 45.0 WATER BASED MUD
2935 1.70 26.0 WATER BASED MUD
3087 1.70 30.0 WATER BASED MUD
3100 1.67 36.0 WATER BASED MUD
3185 1.70 27.0 WATER BASED MUD
3185 1.70 27.0 WATER BASED MUD
3466 1.54 29.0 OIL BASED MUD
3573 1.54 28.0 OIL BASED MUD
4042 1.54 30.0 OIL BASED MUD
4100 1.54 29.0 OIL BASED MUD
4253 1.54 32.0 OIL BASED MUD
4323 1.54 26.0 OIL BASED MUD
4377 1.54 30.0 OIL BASED MUD
4493 1.54 31.0 OIL BASED MUD
4516 1.54 30.0 OIL BASED MUD

Drill stem test

No drill stem test in this wellbore.

Available logs

Log type Intervals logged [m]
PI GR 3150 - 4518
DSI IPL 3157 - 4518
MDT GR 4266 - 4308
MDT GR 4266 - 4396
CSAT GR 3106 - 4518
CSAT GR 1050 - 4518
MDT GR 4278 - 4395

Lithostratigraphy

Top depth [m] Litostratigraphic unit
3103 ROGALAND GP
3103 BALDER FM
3125 SELE FM
3155 LISTA FM
3254 VIDAR FM
3259 LISTA FM
3292 VÅLE FM
3319 SHETLAND GP
3319 EKOFISK FM
3409 TOR FM
3758 HOD FM
3895 BLODØKS FM
3898 HIDRA FM
3900 CROMER KNOLL GP
3900 RØDBY FM
3933 SOLA FM
3935 TUXEN FM
3942 ÅSGARD FM
4119 TYNE GP
4119 MANDAL FM
4135 FARSUND FM
4266 VESTLAND GP
4266 ULA FM
4414 NO FORMAL NAME
4431 ULA FM

Composite log

No composite log presently available.

Geochemical information

File 1 (Format:PDF. Size: 0.428 Mb )
File 2 (Format:PDF. Size: 2.432 Mb )
File 3 (Format:PDF. Size: 0.120 Mb )
Arcrobat reader

You need an ACROBAT reader from ADOBE  to display the reports in pdf format.

Documents reported by the licencees (period for duty of secrecy expired)

No documents presently available.



Valid HTML 4.01!