Go to the NPD's home page The NPD's Fact-pages
Go to the Fact-pages home page Comments, questions and feedback to the NPD Description of all attributes on the WDSS fact-pages Show FactMap

Generated 10.02.2012


After more than 10 years as a fact provider NPDs FactPages version 1 will be shut down in Dec. 2011.
Start using FactPages version 2 now! See also FactPages version 2 Quick Reference'
If you have any questions or comments please send an e-mail to FactWEB@npd.no.


Exploration wellbore: 30/2-1

General information

NPDID wellbore: 72
Well name: 30/2-1
Drilling operator name: Den norske stats oljeselskap a.s
Geodetic datum: ED50
Coordinates: 60° 52` 05.42`` N 2° 38` 49.16`` E
UTM coordinates: 6748315.20 N 480827.13 E
UTM zone: 31
Drilled in production licence: 051
Area: NORTH SEA
Discovery:30/2-1 HULDRA
Field:HULDRA
Drill permit: 328-L
Drilling facility:DYVI DELTA
Drilling days: 149
Wellbore entry date: 17.05.1982
Wellbore completion date: 12.10.1982
Original wellbore purpose: WILDCAT
Wellbore purpose: WILDCAT
Wellbore status: SUSP.REENTERED LATER
Wellbore contents: GAS/CONDENSATE
Discovery wellbore: YES
Formation/age with hydrocarbons 1:BRENT GP / MIDDLE JURASSIC
Seismic location: 702 164 SP 435
Kelly bushing elevation (KB) [m]: 30
Water depth [m]: 125
Total Depth (MD) [m]: 4243
Final vertical depth (TVD) [m]: 4237
Max inclination [°]: 7.75
Bottom hole temperature [°C]: 164
Oldest penetrated age: EARLY JURASSIC
Oldest penetrated formation: STATFJORD FM
Note: All depths, except the water depth, are relative to kelly bushing (RKB)

Wellbore history

General

Well 30/2-1 is located roughly mid-way between the Oseberg Field complex and the Kvitebjørn Field in the Northern North Sea. The primary objective of the well was sandstones of Middle Jurassic age. Secondary objectives were sandstones of Paleocene and Late/Early Triassic age.

Operations and results

Wildcat well 30/2-1 was spudded with the semi-submersible installation Dyvi Delta on 17 May 1982 and drilled to TD at 4243 m, 133 m into the Early Jurassic Statfjord Formation. A total of 125 days were spent on the drilling phase, which was 5 days more than prognosed. Twelve days were lost due to problems with lost circulation, gas influx, stuck pipe and a leaking liner overlap in the 8 1/2" hole section. Three and a half days were lost to free the 13 3/8" casing when this got stuck at 1998 m. Most of those days were caught up because total depth was reached 357 m shallower than prognosed, and because of successfully turbodrilling with diamond bits in the 12 1/4" and 6" hole section. The well was drilled with spud mud down to 1035 m, with Gypsum mud from 1035 m to 1860 m, and with Gypsum/Lignosulphonate mud from 1860 m to 2155 m. An oilfaze/pipelax and an Imco spot/pipelax pill was spotted at 1998 m to free the pipe. From 2155 to TD the well was drilled with Spersene XP 20 (Lignosulphonate).

Hydrocarbons were encountered in the Brent group. The secondary prospects were found to be water wet, although oil shows were recorded in dolomite between 1852 m and 1911 m in the Eocene and in a 30 cm thick sandstone bed at 1952 m in the Late Paleocene Balder Formation. Weak shows were also recorded on sandstones from 4119 m to 4202 m in the Statfjord Formation.

Eleven cores were cut with a total recovery of 108.8 metres. Two cores were cut from 1952 m to 1969.5 m in the Late Paleocene Balder Formation, while 9 cores were cut from 3696 m to 3794 m in the Ness, Etive, and Rannoch Formations of the Brent Group. Five RFT runs were made. From the pressure data no hydrocarbon-water contact was seen and it was concluded hat the Brent Group was completely hydrocarbon filled. At 3791 m one 2 3/4 -gallon sample (gas and filtrate) and one 1 -gallon sample (filtrate only) was obtained, and at 3763 m one 2 3/4 -gallon sample (0.85 l condensate) was obtained.

The well was suspended on 12 October 1982 on as a gas/condensate discovery.

Testing

Three DST'S were performed in the well. All three tests produced gas and condensate. DST 1 tested the interval 3785 - 3792 m in the Rannoch Formation. The maximum gas production was about 677000 sm3/day on a 32/64" choke with a GOR of about 2200 Sm3/Sm3. The condensate gravity was 0.804 g/cc and the gas gravity was 0.695 (air = 1). The CO2 content was 2% and the H2S content was nil. DST 2 tested the interval 3761 - 3771 m in the Etive Formation. The maximum production was about 1030000 Sm3/day on a 48/64" choke with a GOR of about 2470 Sm3/Sm3. The condensate gravity was 0.807 g/cc and the gas gravity was 0.695 (air = 1). The CO2 content was 4%. DST 3 tested the interval 3720 - 3771 m in the Etive Formation. The maximum production was about 1016000 Sm3/day on a 48/64" choke with a GOR of approximately 2564 sm3/Sm3. The condensate gravity was 0.814 g/cc and the gas gravity was 0.692 (air = 1). Six ppm H2S and 4 % CO were measured during this test. Sand production was not observed in any of the tests. The gauges used at bottom hole had a temperature limit of 150 deg. C and the measured BHT seemed to approach this limit.

Cuttings available at the NPD

Interval [m]: 220.00 - 4242.50

Cores available at the NPD

Core length [m]: 109.10

Core number Interval
1 1952-1954
2 1954-1968.1
3 3696-3700.8
4 3701-3708.3
5 3712-3716.4
6 3717-3733.6
7 3733.6-3734.65
8 3735.8-3751.9
9 3751.5-3758
10 3758-3775.95
11 3776-3794

Scanned core photos

No scanned core photos available

Palynological slides available at the NPD

Oil samples available at the NPD

Test type: Bottle test number: Bottle interval [m]: Fluid type: Test date and time:
DST DST1 3792.000 - 3785.000 1982.09.23 00:00
DST DST2 3771.000 - 3761.000 1982.09.30 00:15
DST DST2B 0.000 - 0.000 OIL 1982.09.25 00:00
DST DST3 3728.000 - 3720.000 1982.10.07 00:01

Casing and leak-off tests

Type Casing diam. [inch] Depth below KB [m] Hole diam. [inch] Hole depth below KB [m] Lot mud eqv. [g/cm3]
CONDUCTOR 30 216.0 36 219.0
SURF.COND. 20 1020.0 26 1035.0 1.70
INTERM. 13 3/8 2152.0 17 1/2 2155.0 1.94
INTERM. 9 5/8 3491.0 12 1/4 3501.0 1.99
LINER 7 3834.0 8 1/2 3836.0 2.05
OPEN HOLE 4243.0 6 4243.0

Mud

Depth MD [m] Mud weight [g/cm3] Visc. [MPa.s] Yield [pnt Pa.] Mud type Date measured
210 1.03 100.0 waterbased
260 1.06 70.0 waterbased
1100 1.10 33.0 waterbased
1780 1.24 41.0 waterbased
2210 1.70 58.0 waterbased
2600 1.77 59.0 waterbased
3130 1.80 51.0 waterbased
3670 1.89 58.0 waterbased
3750 1.91 55.0 waterbased

Drill stem test (intervals and pressures)

Test no. Test interval [m] Choke size [mm] Final shut in pressure [MPa] Final flow pressure [MPa] Bottom hole pressure [MPa] Downhole temperature [°C]
1.0 3785 - 3792 12.7 0
2.0 3761 - 3771 19.0 0
3.0 3720 - 3728 19.0 0

Drill Stem Test (recovery)

Test no. Oil [Sm3/day] Gas [Sm3/day] Oil grav. [g/cm3] Gas grav. rel.air GOR [m3/m3]
1.0 307 677000 .804 .695 2205
2.0 417 1030000 .807 .695 2470
3.0 396 1016000 .814 .692 2565

Available logs

Log type Intervals logged [m]
ISF SONIC MSFL GR SP 216 - 4243
FDC CNL GR CAL 1020 - 4244
DLL MSFL GR 3600 - 3829
HDT 3491 - 3831
HDT 3837 - 4244
GEODIP 3492 - 3620
CBL CDL GR 820 - 2152
CBL VDL GR 2905 - 3775
CBL VDL GR 3775 - 3837
NGT 3600 - 3834
VELOCITY 960 - 4243

Lithostratigraphy

Top depth [m] Litostratigraphic unit
155 NORDLAND GP
847 UTSIRA FM
957 HORDALAND GP
1917 ROGALAND GP
1917 BALDER FM
1993 SELE FM
2105 LISTA FM
2159 SHETLAND GP
3605 CROMER KNOLL GP
3636 VIKING GP
3636 DRAUPNE FM
3657 HEATHER FM
3675 BRENT GP
3675 NESS FM
3720 ETIVE FM
3778 RANNOCH FM
3793 DUNLIN GP
3793 DRAKE FM
3962 COOK FM
4000 BURTON FM
4110 NO GROUP DEFINED
4110 STATFJORD FM

Composite log

No composite log presently available.

Geochemical information

File 1 (Format:PDF. Size: 1.503 Mb )
File 2 (Format:PDF. Size: 0.371 Mb )
File 3 (Format:PDF. Size: 1.193 Mb )
File 4 (Format:PDF. Size: 0.849 Mb )
File 5 (Format:PDF. Size: 0.427 Mb )
Arcrobat reader

You need an ACROBAT reader from ADOBE  to display the reports in pdf format.

Documents reported by the licencees (period for duty of secrecy expired)

Completion_Report_and_Completion_log (Format:PDF. Size: 43.350 Mb )
Cation_exchange_capacity (Format:PDF. Size: 0.073 Mb )
Comparison_of_separator_samples (Format:PDF. Size: 0.571 Mb )
Drilling_fluid_recap (Format:PDF. Size: 2.749 Mb )
Final_core_report_core_11 (Format:PDF. Size: 1.477 Mb )
Final_well_report (Format:PDF. Size: 11.220 Mb )
Geochemical_analysis_of_sediments (Format:PDF. Size: 0.568 Mb )
Geological_prognosis_and_Drilling_program (Format:PDF. Size: 1.747 Mb )
Geological_prognosis_and_Drilling_program_encl_01 (Format:PDF. Size: 0.103 Mb )
Geological_prognosis_and_Drilling_program_encl_02 (Format:PDF. Size: 0.859 Mb )
Int_palynofacies_sedimentological_core (Format:PDF. Size: 1.291 Mb )
Int_palynofacies_sedimentological_core_encl_01 (Format:PDF. Size: 0.318 Mb )
Int_palynofacies_sedimentological_core_encl_02 (Format:PDF. Size: 0.365 Mb )
Interpretaion_Six_by_SCHLUMBERGER (Format:PDF. Size: 7.417 Mb )
Interpretation_Six_encl_01 (Format:PDF. Size: 0.359 Mb )
Interpretation_Six_encl_02 (Format:PDF. Size: 0.241 Mb )
Interpretation_Six_encl_03 (Format:PDF. Size: 0.392 Mb )
Interpretation_Six_encl_04 (Format:PDF. Size: 1.182 Mb )
Interpretation_Six_encl_05 (Format:PDF. Size: 0.627 Mb )
Interpretation_Six_encl_06 (Format:PDF. Size: 0.413 Mb )
Paleo_strat_final_report (Format:PDF. Size: 7.563 Mb )
Petroleum_geochemistry_report (Format:PDF. Size: 1.275 Mb )
Petroleum_geochemistry_report_B (Format:PDF. Size: 0.898 Mb )
Petrophysical_evaluation (Format:PDF. Size: 1.425 Mb )
Petrophysical_evaluation_encl_01 (Format:PDF. Size: 0.680 Mb )
Preliminary_description_interpretation_of_cores (Format:PDF. Size: 0.338 Mb )
Pressure_prediction (Format:PDF. Size: 0.680 Mb )
Pressure_survey_report_DST2_Gauge_0022_SPERRY (Format:PDF. Size: 1.272 Mb )
Pressure_survey_report_DST2_Gauge_0054_SPERRY (Format:PDF. Size: 0.878 Mb )
Pressure_survey_report_DST3_Gauge0054_SPERRY (Format:PDF. Size: 2.212 Mb )
Pressure_survey_report_DST3_sureface_SPERRY (Format:PDF. Size: 0.347 Mb )
Pressure_survey_report_Run1_ DST1_G51&54_SPERRY (Format:PDF. Size: 1.683 Mb )
Pressure_survey_report_Run1_DST1_SPERRY (Format:PDF. Size: 0.784 Mb )
Pressure_survey_report_Run1_DST3_SPERRY (Format:PDF. Size: 1.037 Mb )
Pressure_survey_report_by_SPERRY (Format:PDF. Size: 0.353 Mb )
Pressure_temperature_measurements_by_FLOPETROL (Format:PDF. Size: 4.077 Mb )
Processing_Global_by_SCHLUMBERGER (Format:PDF. Size: 0.018 Mb )
Processing_Global_encl_01 (Format:PDF. Size: 6.995 Mb )
Processing_Global_encl_02 (Format:PDF. Size: 1.192 Mb )
RFT_Report_a (Format:PDF. Size: 0.335 Mb )
RFT_Report_a_encl_01 (Format:PDF. Size: 1.554 Mb )
RFT_Report_a_encl_02 (Format:PDF. Size: 3.447 Mb )
RFT_Report_b (Format:PDF. Size: 0.295 Mb )
RFT_Report_b_encl_1 (Format:PDF. Size: 1.348 Mb )
RFT_Report_b_encl_2 (Format:PDF. Size: 2.622 Mb )
Report_on_stable_isotopes_on_natural_gas (Format:PDF. Size: 0.438 Mb )
Reservoir_Fluid_Study_DST_3 (Format:PDF. Size: 0.977 Mb )
Reservoir_fluid_study_DST_2 (Format:PDF. Size: 0.968 Mb )
Residual_gas_measurements (Format:PDF. Size: 1.035 Mb )
Special_core_analysis (Format:PDF. Size: 4.226 Mb )
Special_core_analysis_by_STATOIL (Format:PDF. Size: 1.664 Mb )
TBP_Distillation_of_condensate_DST_2 (Format:PDF. Size: 0.377 Mb )
Test_program_Dyvi_Delta (Format:PDF. Size: 0.879 Mb )
Thin_section_analysis (Format:PDF. Size: 8.734 Mb )
Time_breakdown_and_review_of_operations (Format:PDF. Size: 0.534 Mb )
Wax_analysis_of_condensate_DST_no_2B (Format:PDF. Size: 0.260 Mb )
Well_summary (Format:PDF. Size: 2.540 Mb )
Well_testing_report (Format:PDF. Size: 2.658 Mb )
Well_testing_report_DST_1_by_FLOPETROL (Format:PDF. Size: 2.306 Mb )
Well_testing_report_DST_2_by_FLOPETROL (Format:PDF. Size: 2.538 Mb )
Well_testing_report_DST_3_by_FLOPETROL (Format:PDF. Size: 2.611 Mb )
Well_testing_report_encl_01 (Format:PDF. Size: 0.804 Mb )
Arcrobat reader

You need an ACROBAT reader from ADOBE  to display the reports in pdf format.

Old NPD WDSS reports, NPD papers and other related documents

WDSS_General_Information (Format:PDF. Size: 0.207 Mb )
WDSS_completion_log (Format:PDF. Size: 0.295 Mb )
Arcrobat reader

You need an ACROBAT reader from ADOBE  to display the reports in pdf format.



Valid HTML 4.01!