| NPDID wellbore: |
845 |
| Well name: |
33/9-A-15 |
| Drilling operator name: |
Mobil Exploration Norway INC |
| Geodetic datum: |
ED50 |
| Coordinates: |
61° 15` 20.81`` N |
1° 51` 14.82`` E |
| UTM coordinates: |
6791978.49 N |
438522.02 E |
| UTM zone: |
31 |
| Drilled in production licence: |
037 |
| Area: |
NORTH SEA |
| Discovery: | 33/12-1 STATFJORD |
| Field: | STATFJORD |
| Drill permit: |
321-P |
| Drilling facility: | STATFJORD A |
| Production facility: | STATFJORD A |
| Predrill entry date: |
|
| Predrill completion date: |
|
| Wellbore entry date: |
11.09.1985 |
| Wellbore completion date: |
12.10.1985 |
| Multilateral wellbore: |
NO |
| Original wellbore purpose: |
PRODUCTION |
| Wellbore purpose: |
PRODUCTION |
| Wellbore status: |
PLUGGED |
| Original wellbore content: |
OIL |
| Wellbore content: |
NOT AVAILABLE |
| Discovery wellbore: |
NO |
| Seismic location: |
M3D 80 - 0302 |
| Kelly bushing elevation (KB) [m]: |
64 |
| Water depth [m]: |
146 |
| Total depth [m]: |
2845 |
| Last updated by NPD: |
20.11.2003 |
| Note: All depths, except the water depth, are relative to kelly bushing (RKB) |