7317/9-1

04/08/2017 The Norwegian Petroleum Directorate has granted Statoil Petroleum AS a drilling permit for well 7317/9-1, cf. Section 8 of the Resource Management Regulations.

Well 7317/9-1 will be drilled from the Songa Enabler drilling facility, at position 73°27'50.46" north and 17°48'10.53" east after completing the drilling of wildcat well 7435/12-1 for Statoil Petroleum AS in production licence 859.

The drilling programme for well 7317/9-1 relates to the drilling of a wildcat well in production licence 718.

Statoil Petroleum AS is the operator with an ownership interest of 60 per cent. The other licensees are Dea Norge AS (20 per cent) and Petoro AS (20 per cent).

The area in this licence consists of the blocks 7317/8 and 7317/9. The well will be drilled about 75 kilometres northwest of the discovery 7319/12-1 (Pingvin) and about 370 kilometres from Hammerfest.

Production licence 718 was awarded in 2013 in the 22nd licensing round on the Norwegian shelf. This is the first well to be drilled in the licence.

The permit is contingent upon the operator securing all other permits and consents required by other authorities prior to commencing the drilling activities.

7317/9-1ing Sæle, tel. +47 51 87 64 52

Updated: 21/08/2017

Latest news

Dry well north of the Heidrun field in the Norwegian Sea – 6507/8-11 S
29/11/2022 Equinor Energy AS, operator of production licence 124, has concluded the drilling of exploration well 6507/8-11 S.
Correction of production figures October 2022
25/11/2022 NPD has made an adjustment to the preliminary gas-production figures for October.
Welcome to IEA Technical Collaboration workshops
10/11/2022 22. – 23. November: Research and experience on Enhanced Oil Recovery. 24. November: "Oil and gas in the context of energy security and transition".
Drilling permit for well 25/10-17 S
10/11/2022 The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 25/10-17 S, cf. Section 13 of the Resource Management Regulations.
Drilling permit for well 16/1-35 S
08/11/2022 The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 16/1-35 S, cf. Section 13 of the Resource Management Regulations.
All status reports are now on the FactPages and the FactMaps
04/11/2022 All available status reports (relinquishment reports) are now available on the FactPages.
Gas/condensate discovery near the Oseberg field in the North Sea
04/11/2022 OMV (Norge) AS, operator of production licence 1100, is in the process of concluding the drilling of exploration wells 30/5-4 S and 30/5-4 A.
Announcement: Acreage for CO2 storage on the Norwegian Continental Shelf
02/11/2022 On 2 November 2022, the Ministry of Petroleum and Energy announced an area for CO2 storage pursuant to the CO2 Storage Regulations.
Sharing data from older wells
31/10/2022 Production and injection data from older wellbores is now available in Diskos.
Impact assessment for mineral activity on the Norwegian continental shelf
27/10/2022 The impact assessment in connection with the opening process for seabed mineral activities is now being put forward for consultation, with a deadline for responses of 27 January 2023.