16/3-5

06/03/2013 Lundin Norway AS, operator of production licence 501, is about to complete drilling of appraisal well 16/3-5.

The 16/2-6 Johan Sverdrup oil discovery was proven by Lundin during autumn of 2010 in Middle and Upper Jurassic reservoir rocks. The well was drilled about three kilometres east of well 16/2-7 and south of well 16/3-4.

The objective of appraisal well 16/3-5 was to examine the thickness and reservoir properties in the Jurassic and Permian reservoir, oil column, depth of the Jurassic reservoir, and to clarify the oil/water contact in this part of the Johan Sverdrup discovery. The reservoir was encountered somewhat shallower than expected, with a reservoir thickness as expected. The well encountered a 30-metre oil column. The top 14 metres are very good quality Upper Jurassic reservoir rocks, over 16 metres of Permian reservoir rocks (the Zechstein Group) of varying reservoir quality in limestone and dolomite. The total thickness of the Zechstein Group is 25 metres.

Extensive data acquisition and sampling have been carried out in the well. Two formation tests were carried out in Jurassic and Permian reservoir rocks. One test showed a maximum rate of 750 standard cubic metres (Sm3) of oil per flow day through a 48/64-inch nozzle opening from a 14-metre sandstone interval in the Upper Jurassic. The formation test indicates that the Jurassic reservoir has a major lateral scope without flow barriers.

The second formation test was carried out in an 8-metre limestone and dolomite interval in the Zechstein Group, and showed a very low rate without flow to the surface. Loss of drilling mud during drilling at a deeper point in the Zechstein Group shows that the flow properties can vary, as the rocks have zones with large solution pores filled with oil. Special drilling mud was used to close these pores during drilling. Future production of the oil from Permian reservoir rocks can therefore not be ruled out.

This is the twelfth appraisal well in production licence 501. The licence was awarded in APA 2008.

Appraisal well 16/3-5 was drilled to a vertical depth of 2025 metres below the sea surface and terminated in the Rotliegendes Group in the Permian. The well will be permanently plugged and abandoned. Water depth is 115 metres.

The well was drilled by the Bredford Dolphin drilling facility, which will now proceed to production licence 359 to drill wildcat well 16/4-6 S where Lundin Norway AS is the operator.


Contact in the Norwegian Petroleum Directorate
Eldbjørg Vaage Melberg, tel. +47 51 87 61 00

 

Map - download pdf

 

Updated: 06/03/2013

Latest news

Drilling permits are included on FactPages and FactMaps
06/12/2021 Upgrades will be made on the FactPages and FactMaps on Wednesday 8 December, and the pages with associated services may therefore have downtime from 15 to 24.
The Shelf in 2021: Past, present and future on the Norwegian shelf
02/12/2021 Each year in January, we host "The Shelf" event, which is a presentation of the previous year on the Norwegian shelf – and a bit about the years to come.
IOR award 2022 – nominate your candidate
01/12/2021 Now you can nominate candidates for the IOR award! The award was presented for the first time in 1998, and the next time we present the award will be at ONS 2022.
Norwegian Petroleum Directorate to update quality-assured geochemical database for the North Sea
29/11/2021 The geochemical database will be updated twice per year with geochemical data from wells that have recently been released in Diskos.
Drilling permit for well 6306/9-1 in production licence 886
23/11/2021 The Norwegian Petroleum Directorate (NPD) has granted Lundin Energy Norway AS a drilling permit for well 6306/9-1, cf. Section 13 of the Resource Management Regulations.
Production figures October 2021
19/11/2021 Preliminary production figures for October 2021 show an average daily production of 2 062 000 barrels of oil, NGL and condensate.
New technology: Norwegian Petroleum Directorate stepping up efforts
11/11/2021 Technology has been very important for developing the oil and gas industry in Norway.
Minor oil discovery near the Ula field in the southern North Sea – 7/11-14 S
10/11/2021 Aker BP ASA, operator of production licence 906, has concluded the drilling of wildcat well 7/11-14 S.
Minor oil discovery south of the Bøyla field in the North Sea – 24/12-7
09/11/2021 Aker BP ASA, operator of production licence 1041, has concluded the drilling of wildcat well 24/12-7.
Sharing CCS knowledge in Glasgow
03/11/2021 The Norwegian Petroleum Directorate's Eva Halland is giving to CCS presentations this week during CoP26, the UN climate conference in Glasgow.