35/11-17

30/04/2014 Statoil Petroleum AS, operator of production licence 090, is in the process of concluding drilling of wildcat well 35/11-17. The well was drilled about one kilometre south of the Fram field in the North Sea.

The well’s primary exploration target was to prove petroleum in Middle Jurassic reservoir rocks (the Brent group). The secondary target was to prove petroleum in Middle Jurassic reservoir rocks (the Fensfjord formation).

The well encountered a 48-metre gross oil column in the Brent group, 10 metres of which has good reservoir quality in the Etive and Rannoch formations. A 38-metre gross oil column was encountered in the Fensfjord formation, 20 metres of which has good reservoir quality. Oil/water contact was established in both the primary and secondary exploration targets.

An approx. 10-metre oil column was also encountered in Lower Jurassic reservoir rocks (the Oseberg formation) with good reservoir quality.

The well was not formation tested, but extensive data acquisition and sampling have been carried out.

The preliminary size of the discovery has been estimated at between one and three million standard cubic metres (Sm3) of recoverable oil equivalents.

The licensees in production licence 090 will evaluate the discovery along with nearby prospects with a view toward further development.

This is the 16th exploration well in production licence 090, which was awarded in the 8th licencing round in 1984.

The well was drilled to a vertical depth of 2889 metres below the sea surface, and was terminated in the Cook formation in the Lower Jurassic.

Water depth is 357 metres. The well will be permanently plugged and abandoned.

Well 35/11-17 was drilled by the Songa Trym drilling facility, which will move on to drill production well 35/11-A-31 in the same production licence, where Statoil Petroleum AS is the operator.


Contact in the Norwegian Petroleum Directorate

Eldbjørg Vaage Melberg, tel. +47 51 87 61 00

 

Map - Download pdf

Updated: 30/04/2014

Latest news

Dry well north of the Heidrun field in the Norwegian Sea – 6507/8-11 S
29/11/2022 Equinor Energy AS, operator of production licence 124, has concluded the drilling of exploration well 6507/8-11 S.
Correction of production figures October 2022
25/11/2022 NPD has made an adjustment to the preliminary gas-production figures for October.
Welcome to IEA Technical Collaboration workshops
10/11/2022 22. – 23. November: Research and experience on Enhanced Oil Recovery. 24. November: "Oil and gas in the context of energy security and transition".
Drilling permit for well 25/10-17 S
10/11/2022 The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 25/10-17 S, cf. Section 13 of the Resource Management Regulations.
Drilling permit for well 16/1-35 S
08/11/2022 The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 16/1-35 S, cf. Section 13 of the Resource Management Regulations.
All status reports are now on the FactPages and the FactMaps
04/11/2022 All available status reports (relinquishment reports) are now available on the FactPages.
Gas/condensate discovery near the Oseberg field in the North Sea
04/11/2022 OMV (Norge) AS, operator of production licence 1100, is in the process of concluding the drilling of exploration wells 30/5-4 S and 30/5-4 A.
Announcement: Acreage for CO2 storage on the Norwegian Continental Shelf
02/11/2022 On 2 November 2022, the Ministry of Petroleum and Energy announced an area for CO2 storage pursuant to the CO2 Storage Regulations.
Sharing data from older wells
31/10/2022 Production and injection data from older wellbores is now available in Diskos.
Impact assessment for mineral activity on the Norwegian continental shelf
27/10/2022 The impact assessment in connection with the opening process for seabed mineral activities is now being put forward for consultation, with a deadline for responses of 27 January 2023.