7324/7-2

03/07/2014 OMV (Norge) AS, operator of production licence 537, is about to complete drilling of wildcat well 7324/7-2.

The well was drilled about seven kilometres northwest of the 7324/8-1 "Wisting Central" oil discovery and 315 kilometres north of Hammerfest.

The primary exploration target for the well was to prove petroleum in Middle Jurassic to Late Triassic reservoir rocks (Stø, Nordmela and Fruholmen formations). The secondary exploration target was to prove petroleum in Late to Middle Triassic reservoir rocks (Snadd formation).

The well encountered an oil column of about 20 metres in the Stø formation, with very good reservoir properties.

Mainly gas was encountered in sandstone layers in the Snadd formation with poor reservoir properties, and no gas gradient was established.

Preliminary calculations of the size of the discovery are between three and eight million standard cubic metres (Sm3) of recoverable oil.

A successful formation test was carried out in the Stø formation. The maximum production rate was 319 Sm3 oil and 9195 Sm3 associated gas per flow day through a 56/64-inch nozzle opening.

This is the third exploration well in production licence 537. The licence was awarded in the 20th licensing round in 2009.

The well was drilled to a vertical depth of 1679 metres below the sea surface and terminated in the Snadd formation from the Late to Middle Triassic Age. The water depth is 418 metres. The well will now be permanently plugged and abandoned.

Well 7324/7-2 was drilled by the Transocean Barents drilling facility, which will now proceed to a shipyard on Stord for five-year recertification.


Contact in the Norwegian Petroleum Directorate
Eldbjørg Vaage Melberg, tel. +47 51 87 61 00

 

Map - Download pdf

Updated: 03/07/2014

Latest news

NPD to present new resource report
04/08/2022 On Thursday, 25 August, Kjersti Dahle Grov, Director of Technology, Analysis and Coexistence, will present the Resource Report 2022.
Drilling permit for well 6507/8-11 S
03/08/2022 The Norwegian Petroleum Directorate (NPD) has granted Equinor Energy AS drilling permit for well 6507/8-11 S, cf. Section 13 of the Resource Management Regulations.
Dry well near the Brage field in the North Sea – 31/4-A-13 C
29/07/2022 Wintershall Dea Norge AS, operator of production licence 055, has concluded the drilling of wildcat well 31/4-A-13 C.
High level of activity on the Norwegian shelf in the first half of 2022
20/07/2022 50 years after the Storting (parliament) decided to establish the Norwegian Petroleum Directorate (NPD), there is still plenty of activity on the Norwegian shelf.
Production figures June 2022
20/07/2022 Preliminary production figures for June 2022 show an average daily production of 1 529 000 barrels of oil, NGL and condensate.
Drilling permit for well 31/1-3 S and 31/1-3 A
20/07/2022 The Norwegian Petroleum Directorate (NPD) has granted Equinor Energy AS drilling permit for well 31/1-3 S and 31/1-3 A, cf. Section 13 of the Resource Management Regulations.
Gas discovery near the Skarv field in the Norwegian Sea – 6507/2-6
13/07/2022 Aker BP ASA, operator of production licence 261, has concluded the drilling of wildcat well 6507/2-6.
Dry well near the Fenja field in the Norwegian Sea – 6306/3-2
11/07/2022 ConocoPhillips Skandinavia AS, operator of production licence 935, has concluded the drilling of wildcat well 6306/3-2.
Temporary appointment - Director general
04/07/2022 The Ministry of Petroleum and Energy has announced a temporary appointment, naming Torgeir Stordal (60) as Director General of the NPD from 30 June and until a new Director General of the NPD is hired.
Drilling permit for well 30/5-4 S
04/07/2022 The Norwegian Petroleum Directorate (NPD) has granted OMV (Norge) AS drilling permit for well 30/5-4 S, cf. Section 13 of the Resource Management Regulations.