2/4-22 S

13/02/2015 Statoil Petroleum AS, operator of production licence 146, is in the process of completing the drilling of wildcat well 2/4-22 S.

The well was drilled about 20 kilometres north of the Ekofisk field and 2.3 kilometres northeast of the 2/4-21 discovery in the southern part of the North Sea.

The primary exploration target for well 2/4-22 S was to prove petroleum in reservoir rocks in the Permian (in the Rotliegend group). The secondary exploration target was to prove petroleum in reservoir rocks in the Middle Jurassic (the Bryne formation).

In its primary exploration target, the well encountered a 27-metre total oil column in the Rotliegend group, 24 metres of which was sandstone of good reservoir quality. In its secondary exploration target, the well encountered oil columns in two intervals in the Bryne formation, where the top interval also extends into the overlying Ula formation in the Upper Jurassic. No oil/water contact was encountered in either of the intervals in the Jurassic. The Bryne formation has a 46-metre total oil column, about 30 metres of which is sandstone of good to poor reservoir quality. The Bryne and Ula formations have a 49-metre total oil column, about 15 metres of which are from multiple thin sandstone layers with good to poor reservoir quality.

Data acquisition and sampling have been carried out.

Preliminary estimates of the size of the discovery range between 0.7 and 2 million Sm3 of recoverable oil equivalents. Further studies are needed in order to determine whether the discovery can be included as part of a future development of the area.

This is the ninth exploration well in production licence 146. The license was awarded in the 12th licensing round in 1988.

Well 2/4-22 S was drilled to a vertical depth of 4834 metres below sea level and was terminated in the Rotliegend group. Water depth at the site is 67 metres. The well will now be permanently plugged and abandoned.

Well 2/4-22 S was drilled by the Maersk Gallant drilling facility, which will now move on to drill exploration well 2/4-23 in the same production licence.

Contact in the Norwegian Petroleum Directorate
Eldbjørg Vaage Melberg
, tel. +47 51 87 61 00

Map - Download pdf

Updated: 11/02/2016

Latest news

Dry well north of the Heidrun field in the Norwegian Sea – 6507/8-11 S
29/11/2022 Equinor Energy AS, operator of production licence 124, has concluded the drilling of exploration well 6507/8-11 S.
Correction of production figures October 2022
25/11/2022 NPD has made an adjustment to the preliminary gas-production figures for October.
Welcome to IEA Technical Collaboration workshops
10/11/2022 22. – 23. November: Research and experience on Enhanced Oil Recovery. 24. November: "Oil and gas in the context of energy security and transition".
Drilling permit for well 25/10-17 S
10/11/2022 The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 25/10-17 S, cf. Section 13 of the Resource Management Regulations.
Drilling permit for well 16/1-35 S
08/11/2022 The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 16/1-35 S, cf. Section 13 of the Resource Management Regulations.
All status reports are now on the FactPages and the FactMaps
04/11/2022 All available status reports (relinquishment reports) are now available on the FactPages.
Gas/condensate discovery near the Oseberg field in the North Sea
04/11/2022 OMV (Norge) AS, operator of production licence 1100, is in the process of concluding the drilling of exploration wells 30/5-4 S and 30/5-4 A.
Announcement: Acreage for CO2 storage on the Norwegian Continental Shelf
02/11/2022 On 2 November 2022, the Ministry of Petroleum and Energy announced an area for CO2 storage pursuant to the CO2 Storage Regulations.
Sharing data from older wells
31/10/2022 Production and injection data from older wellbores is now available in Diskos.
Impact assessment for mineral activity on the Norwegian continental shelf
27/10/2022 The impact assessment in connection with the opening process for seabed mineral activities is now being put forward for consultation, with a deadline for responses of 27 January 2023.