6406/12-5 S

10/11/2015 VNG Norge AS, operator of production licence 586, is in the process of completing the drilling of wildcat well 6406/12-5 S.

The well has been drilled about 33 kilometres southwest of the Njord field and about five kilometres southeast of the 6406/12-3 S (Pil) discovery in the Norwegian Sea.

The purpose of the well was to prove petroleum in reservoir rocks from the Upper Jurassic (the Rogn and Melke formations). The well encountered about 12 metres of sandstone in the Rogn formation with moderate reservoir quality. The well also encountered 31 metres of sandstone in intra Spekk formation and 182 meters of sandstone in the Melke formation, both with moderate reservoir quality. The reservoir only has traces of oil. The well is classified as dry.

Data acquisition and sampling have been carried out.

This is the sixth exploration well in production licence 586. The licence was awarded in APA 2010.

Well 6406/12-5 S was drilled to a vertical depth of 3710 metres and a measured depth of 4297 metres below the sea surface and was terminated in the Melke formation in the Upper Jurassic. The water depth at the site is 336 metres. The well will now be permanently plugged and abandoned.

Well 6406/12-5 S was drilled by the Transocean Arctic drilling facility, which now will drill wildcat well 7130/4-1 in production licence 708 in the Barents Sea, where Lundin Norway AS is the operator.


Contact in the Norwegian Petroleum Directorate

Eldbjørg Vaage Melberg, tel. +47 51 87 61 00

Map - Download pdf

Updated: 11/02/2016

Latest news

Dry well north of the Heidrun field in the Norwegian Sea – 6507/8-11 S
29/11/2022 Equinor Energy AS, operator of production licence 124, has concluded the drilling of exploration well 6507/8-11 S.
Correction of production figures October 2022
25/11/2022 NPD has made an adjustment to the preliminary gas-production figures for October.
Welcome to IEA Technical Collaboration workshops
10/11/2022 22. – 23. November: Research and experience on Enhanced Oil Recovery. 24. November: "Oil and gas in the context of energy security and transition".
Drilling permit for well 25/10-17 S
10/11/2022 The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 25/10-17 S, cf. Section 13 of the Resource Management Regulations.
Drilling permit for well 16/1-35 S
08/11/2022 The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 16/1-35 S, cf. Section 13 of the Resource Management Regulations.
All status reports are now on the FactPages and the FactMaps
04/11/2022 All available status reports (relinquishment reports) are now available on the FactPages.
Gas/condensate discovery near the Oseberg field in the North Sea
04/11/2022 OMV (Norge) AS, operator of production licence 1100, is in the process of concluding the drilling of exploration wells 30/5-4 S and 30/5-4 A.
Announcement: Acreage for CO2 storage on the Norwegian Continental Shelf
02/11/2022 On 2 November 2022, the Ministry of Petroleum and Energy announced an area for CO2 storage pursuant to the CO2 Storage Regulations.
Sharing data from older wells
31/10/2022 Production and injection data from older wellbores is now available in Diskos.
Impact assessment for mineral activity on the Norwegian continental shelf
27/10/2022 The impact assessment in connection with the opening process for seabed mineral activities is now being put forward for consultation, with a deadline for responses of 27 January 2023.