16/4-11

26/03/2018 Lundin Norge AS, operator of production licence 359, has concluded the drilling of appraisal well 16/4-11. 

The 16/4-6 S discovery was proven in 2013 in Triassic reservoir rocks, and has been delineated by several wells. 16/4-11 was drilled about 2.5 kilometres south of the 16/4-6 S discovery well, 20 kilometres south of the Edvard Grieg field and around 190 kilometres southwest of Stavanger. Prior to the drilling of 16/4-11, the operator's resource estimate for the discovery was between 4-10 million standard cubic metres (Sm3) of recoverable oil and between 1 and 3 billion Sm3 recoverable gas.

The objective of the well was to delineate the southwest flank of the 16/4-6 S (Luno II) discovery, to investigate the reservoir properties in previously undrilled reservoir units, as well as to investigate the type of oil and total oil column in this part of the discovery.

Well 16/4-11 encountered a total oil column of about 20 metres in Triassic sandstones with good to very good reservoir quality. The oil/water contact was encountered at 1946.5 metres below sea level. The entire reservoir, including the water zone, mainly consists of sandstones with some conglomerate sandstone layers, and has a total thickness of about 400 metres with variable reservoir quality, primarily from moderate to very good.

Preliminary estimates place the size of the discovery between 5 and 13 million Sm3 of recoverable oil and between 1 and 3 billion Sm3 of recoverable gas. The licensees will evaluate the discovery as regards a potential development through linking the discovery to existing infrastructure on the Edvard Grieg field.

The well was not formation-tested, but extensive data acquisition and sampling have been carried out.

This is the fifth exploration well drilled in production licence 359, and the fourth well on the 16/4-6 S (Luno II) oil/gas discovery. The licence was awarded in APA 2005.

Well 16/4-11 was drilled to a vertical depth of 2450 metres below the sea surface, and was terminated in Triassic or Permian rocks. Water depth at the site is 100 metres. The well will now be permanently plugged and abandoned.

The well was drilled by COSL Innovator, which will now drill appraisal well 16/1-28 S on the 16/1-12 Rolvsnes oil discovery in production licence 338 C, where Lundin Norge AS is operator.

     

    16/4-11

    Updated: 26/03/2018

    Latest news

    Dry well north of the Heidrun field in the Norwegian Sea – 6507/8-11 S
    29/11/2022 Equinor Energy AS, operator of production licence 124, has concluded the drilling of exploration well 6507/8-11 S.
    Correction of production figures October 2022
    25/11/2022 NPD has made an adjustment to the preliminary gas-production figures for October.
    Welcome to IEA Technical Collaboration workshops
    10/11/2022 22. – 23. November: Research and experience on Enhanced Oil Recovery. 24. November: "Oil and gas in the context of energy security and transition".
    Drilling permit for well 25/10-17 S
    10/11/2022 The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 25/10-17 S, cf. Section 13 of the Resource Management Regulations.
    Drilling permit for well 16/1-35 S
    08/11/2022 The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 16/1-35 S, cf. Section 13 of the Resource Management Regulations.
    All status reports are now on the FactPages and the FactMaps
    04/11/2022 All available status reports (relinquishment reports) are now available on the FactPages.
    Gas/condensate discovery near the Oseberg field in the North Sea
    04/11/2022 OMV (Norge) AS, operator of production licence 1100, is in the process of concluding the drilling of exploration wells 30/5-4 S and 30/5-4 A.
    Announcement: Acreage for CO2 storage on the Norwegian Continental Shelf
    02/11/2022 On 2 November 2022, the Ministry of Petroleum and Energy announced an area for CO2 storage pursuant to the CO2 Storage Regulations.
    Sharing data from older wells
    31/10/2022 Production and injection data from older wellbores is now available in Diskos.
    Impact assessment for mineral activity on the Norwegian continental shelf
    27/10/2022 The impact assessment in connection with the opening process for seabed mineral activities is now being put forward for consultation, with a deadline for responses of 27 January 2023.