6506/11-10

04/04/2018 OMV (Norway) AS, operator of production licences 644 and 644 B, is in the process of completing the drilling of wildcat well 6506/11-10 in PL 644 B.

The well was drilled about 5 kilometres north-west of the Morvin field in the central part of the Norwegian Sea and 245 kilometres north-west of Kristiansund.

The well's primary and secondary exploration targets were to prove petroleum in the Lower Cretaceous (Lange formation) and Middle Jurassic (Garn formation), respectively.

In the primary exploration target, the well encountered a gas/condensate column totalling about 35 metres in the Lange formation. 15 metres of this constitutes the reservoir, which consists of sandstone with moderate to good reservoir properties. The gas/water contact was not encountered. Preliminary estimates indicate that the size of the discovery in the Lange formation is between 3 and 18 million standard cubic metres (Sm3) of recoverable oil equivalents.

In the secondary exploration target, the well encountered a gas/condensate column totalling about 95 metres in the Garn formation. 85 metres of this constitutes the reservoir, which consists of sandstone with variable reservoir quality from moderate to very good. The gas/water contact was encountered at 4295 metres below sea level. Preliminary estimates indicate that the size of the discovery in the Garn formation is between 3 and 21 million standard cubic metres (Sm3) of recoverable oil equivalents.

The licensees will consider delimiting the discovery with a view towards potential future development.

The well was not formation-tested, but extensive data acquisition and sampling were carried out.

This is the first exploration well in production licence 644 B. This licence was awarded in APA 2011.

Well 6506/11-10 was drilled to a vertical depth of 4513 metres below the sea surface and was terminated in the Ror formation in the Lower Jurassic.

Water depth is 342 metres. The well will now be permanently plugged and abandoned.

The well was drilled by the Deepsea Bergen drilling facility, which will now move on to drill appraisal well 15/3-10 on the 15/3-4 Sigrun gas/oil discovery in production licence 025 in the central part of the North Sea, where Statoil Petroleum AS is the operator.

 

Contact in the Norwegian Petroleum Directorate

Eldbjørg Vaage Melberg, tel. +47 51 87 61 00

 

6506/11-10

Updated: 04/04/2018

Latest news

Dry well north of the Heidrun field in the Norwegian Sea – 6507/8-11 S
29/11/2022 Equinor Energy AS, operator of production licence 124, has concluded the drilling of exploration well 6507/8-11 S.
Correction of production figures October 2022
25/11/2022 NPD has made an adjustment to the preliminary gas-production figures for October.
Welcome to IEA Technical Collaboration workshops
10/11/2022 22. – 23. November: Research and experience on Enhanced Oil Recovery. 24. November: "Oil and gas in the context of energy security and transition".
Drilling permit for well 25/10-17 S
10/11/2022 The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 25/10-17 S, cf. Section 13 of the Resource Management Regulations.
Drilling permit for well 16/1-35 S
08/11/2022 The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 16/1-35 S, cf. Section 13 of the Resource Management Regulations.
All status reports are now on the FactPages and the FactMaps
04/11/2022 All available status reports (relinquishment reports) are now available on the FactPages.
Gas/condensate discovery near the Oseberg field in the North Sea
04/11/2022 OMV (Norge) AS, operator of production licence 1100, is in the process of concluding the drilling of exploration wells 30/5-4 S and 30/5-4 A.
Announcement: Acreage for CO2 storage on the Norwegian Continental Shelf
02/11/2022 On 2 November 2022, the Ministry of Petroleum and Energy announced an area for CO2 storage pursuant to the CO2 Storage Regulations.
Sharing data from older wells
31/10/2022 Production and injection data from older wellbores is now available in Diskos.
Impact assessment for mineral activity on the Norwegian continental shelf
27/10/2022 The impact assessment in connection with the opening process for seabed mineral activities is now being put forward for consultation, with a deadline for responses of 27 January 2023.