7322/7-1

13/08/2018 Spirit Energy Norge AS, operator of production licence 852, has concluded the drilling of wildcat well 7322/7-1. The well is dry.

The well was drilled about 120 km north of the Johan Castberg field in the Barents Sea and 310 km north of Hammerfest.

The objective of the well was to prove reservoirs and petroleum in Lower Cretaceous rocks in the Kolje formation. No reservoir rocks were encountered in the Kolje formation. The well is dry.

Data acquisition and sampling have been carried out.

This is the first exploration well in production licence 852, which was awarded in the 23rd Round in 2016.

Well 7322/7-1 was drilled to a vertical depth of 767 metres below the sea surface, and was terminated in an unspecified formation in the Adventdal group from the Early Cretaceous.

Water depth at the site is 454 metres. The well will be permanently plugged and abandoned.

Well 7322/7-1 was drilled by the Island Innovator drilling facility, which will now drill wildcat well 7321/4-1 in production licence 721 in the Barents Sea, where DEA Norge AS is the operator.

Contact in the NPD

Eldbjørg Vaage Melberg, tel. +47 51 87 61 00

7322/7-1

Updated: 13/08/2018

Latest news

Temporary appointment - Director general
04/07/2022 The Ministry of Petroleum and Energy has announced a temporary appointment, naming Torgeir Stordal (60) as Director General of the NPD from 30 June and until a new Director General of the NPD is hired.
Drilling permit for well 30/5-4 S
04/07/2022 The Norwegian Petroleum Directorate (NPD) has granted OMV (Norge) AS drilling permit for well 30/5-4 S, cf. Section 13 of the Resource Management Regulations.
Drilling permit for well 35/6-3 S
04/07/2022 The Norwegian Petroleum Directorate (NPD) has granted Neptune Energy Norge AS drilling permit for well 35/6-3 S, cf. Section 13 of the Resource Management Regulations.
Preparing Nova for start-up
30/06/2022 The authorities have granted consent to start production from the Nova field in the North Sea.
Drilling permit for well 25/7-10
28/06/2022 The Norwegian Petroleum Directorate (NPD) has granted ConocoPhillips Skandinavia AS drilling permit for well 25/7-10, cf. Section 13 of the Resource Management Regulations.
Drilling permit for well 6607/12-5
27/06/2022 The Norwegian Petroleum Directorate (NPD) has granted Equinor Energy AS drilling permit for well 6607/12-5, cf. Section 13 of the Resource Management Regulations.
Prestigious UN post for Harald Brekke
23/06/2022 Senior geologist Harald Brekke has been elected to the Commission on the Limits of the Continental Shelf (CLCS).
Production figures May 2022
21/06/2022 Preliminary production figures for May 2022 show an average daily production of 1 831 000 barrels of oil, NGL and condensate.
Dry well near the Kvitebjørn field in the North Sea – 34/9-1 S
21/06/2022 Equinor Energy AS, operator of production licence 1049, has concluded the drilling of wildcat well 34/9-1.
Ingrid Sølvberg resigns as Director General
17/06/2022 Sølvberg has today, Friday 17 June, resigned from her position as Director General for the Norwegian Petroleum Directorate.