February 2011
11/03/2011
Preliminary production figures for February 2011 indicate an average daily production of about 2 120 000 barrels of oil, NGL and condensate. This is 56 000 barrels less than in January 2011.
Gas production was about 9.4 billion Sm3, which is 1.0 billion Sm3 less than in January.

The average daily liquid production in February was: 1 792 000 barrels of oil, 251 000 barrels of NGL and 69 000 barrels of condensate.
The Trym field started production in February.

Total production so far in 2011 is about 40.0 million Sm3 o.e. (MSm3 o.e.), broken down as follows: about 17.0 MSm3 o.e. of oil, about 3.1 MSm3 o.e. of NGL and condensate and about 19.8 MSm3 o.e. of gas. This is 2.1 MSm3 o.e. less than in 2010.

Final production figures from January 2011 show an average daily production of about 1.835 million barrels of oil, 0.328 million barrels of NGL and condensate and a total of 10.4 billion Sm3 net gas production.
Preliminary figures for March will be published in April 2011.
Contact in the NPD:
Rune Hult, tel. +47 51 87 60 77
Updated: 11/03/2011
Latest news
NPD to present new resource report
04/08/2022
On Thursday, 25 August, Kjersti Dahle Grov, Director of Technology, Analysis and Coexistence, will present the Resource Report 2022.
Drilling permit for well 6507/8-11 S
03/08/2022
The Norwegian Petroleum Directorate (NPD) has granted Equinor Energy AS drilling permit for well 6507/8-11 S, cf. Section 13 of the Resource Management Regulations.
Production figures June 2022
20/07/2022
Preliminary production figures for June 2022 show an average daily production of 1 529 000 barrels of oil, NGL and condensate.
Drilling permit for well 31/1-3 S and 31/1-3 A
20/07/2022
The Norwegian Petroleum Directorate (NPD) has granted Equinor Energy AS drilling permit for well 31/1-3 S and 31/1-3 A, cf. Section 13 of the Resource Management Regulations.
Temporary appointment - Director general
04/07/2022
The Ministry of Petroleum and Energy has announced a temporary appointment, naming Torgeir Stordal (60) as Director General of the NPD from 30 June and until a new Director General of the NPD is hired.
Drilling permit for well 30/5-4 S
04/07/2022
The Norwegian Petroleum Directorate (NPD) has granted OMV (Norge) AS drilling permit for well 30/5-4 S, cf. Section 13 of the Resource Management Regulations.