Production figures August 2020

25/09/2020 Average daily liquids production in August was: 1 722 000 barrels of oil, 270 000 barrels of NGL and 26 000 barrels of condensate.

On 29 April 2020, the Government decided to implement a cut in Norwegian oil production.

The production figures for oil in August include this cut of 134 000 barrels per day in the second half of 2020. 

The Norwegian Petroleum Directorate’s oil production forecasts  have been updated in the Government’s proposed Revised National Budget for 2020. This was presented on 12 May.

The update takes the authorities’ oil production regulation into account, as well as delayed start-up of fields under development and oil production in the first quarter.

Oil production in August is 0.2 percent lower than the NPD’s forecast, and 0.1 percent below the forecast so far this year.

Production August 2020

Figure of production August 2020

 

Oil production 2020

Figure of oil production 2020

 

Liquid production 2020

Figure of liquid production 2020

 

Gas production 2020

Figure of gas production 2020

The total petroleum production for the first eight months in 2020 is about 153.6 million Sm3 oil equivalents (MSm3 o.e.), broken down as follows: about 66.1 MSm3 o.e. of oil, about 12.4 MSm3 o.e. of NGL and condensate and about 75.1 MSm3 o.e. of gas for sale.

The total volume is 9.8 MSm3 o.e. higher than in 2019.

Contact in the NPD
Rune Hult

Tel: +47 51 87 60 77

Updated: 25/09/2020

Latest news

Boreløyve for brønn 6407/9-13 i utvinningsløyve 1060
22/10/2021 The Norwegian Petroleum Directorate has issued a drilling permit to Equinor Energy AS for well 6407/9-13, cf. Section 13 of the Resource Management Regulations.
Dry well southeast of the Johan Sverdrup field in the North Sea – 17/8-1
22/10/2021 Lundin Energy Norway AS, operator of production licence 976, is in the process of concluding the drilling of wildcat well 17/8-1.
Drilling permit for well 36/1-4 S in production licence 885
21/10/2021 The Norwegian Petroleum Directorate has issued a drilling permit to Wellesley Petroleum AS for well 36/1-4 S, cf. Section 13 of the Resource Management Regulations.
Production figures September 2021
20/10/2021 Preliminary production figures for September 2021 show an average daily production of 2 022 000 barrels of oil, NGL and condensate,
Drilling permit for well 24/12-7 in production licence 1041
18/10/2021 The Norwegian Petroleum Directorate has issued a drilling permit to Aker BP ASA for well 24/12-7, cf. Section 13 of the Resource Management Regulations.
Minor oil and gas discovery near the 7122/6-1 (Tornerose) discovery in the Barents Sea – 7122/6-3 S
13/10/2021 Vår Energi AS, operator of production licence 901, has concluded the drilling of wildcat well 7122/6-3 S.
Dry well near the Solveig field in the North Sea – 16/4-12
08/10/2021 Lundin Energy Norway AS, operator of production licence 981, is in the process of concluding the drilling of wildcat well 16/4-12.
25 years’ experience with safe and secure CO2storage
05/10/2021 Carbon capture and storage (CCS) is a hot topic. Director General Ingrid Sølvberg recently took part in a panel discussion at the EU-Norway Energy Conference to spread the word about safe and secure storage of CO2 on the Norwegian shelf.
Minor oil discovery near the Ekofisk field in the North Sea – 2/5-15
28/09/2021 DNO Norge AS, operator of production licence 006 C, has concluded the drilling of wildcat well 2/5-15.
Delineation of the 6507/3-13 oil and gas discovery southwest of the Norne field in the Norwegian Sea – 6507/3-14
28/09/2021 Equinor Energy AS, operator of production licence 159 B, has concluded the drilling of appraisal well 6507/3-14.