Continued high activity on the Norwegian shelf

Kap1

The new report shows the continued importance of applying new technology and knowledge. 

27/09/2019 Even after more than 50 years, the Norwegian shelf still holds vast opportunities.

More than half of the estimated remaining resources on the Norwegian shelf have already been discovered. 85 per cent are located in the fields and 15 per cent are located in discoveries that are being considered for development.

There is also a potential that even more proven oil and gas could become profitable to produce by applying new technology and knowledge.

This is described in more detail in the Norwegian Petroleum Directorate’s 2019 resource report on fields and discoveries.

When Johan Sverdrup and Skogul come on stream this autumn, there will be 88 producing fields on the shelf. Never before have we had production from so many fields. In addition to this, the companies are exploring development opportunities for nearly 90 discoveries.

Average discovery size has declined in recent years, and most of the discoveries will probably be developed as subsea fields and utilising available capacity in existing infrastructure. For that reason, it is important to maintain facilities and pipelines so this is actually possible.

Production will increase going forward to 2023

“There is enough oil and gas on the Norwegian shelf to ensure profitable, efficient and responsible petroleum activity for many decades,” says head of development and operations Ingrid Sølvberg.

“Production will increase going forward to 2023. Despite this, both emissions to air and discharges to sea are holding steady. That means that emissions per produced unit are declining.”

An increasing percentage of the production is operated using power from shore. In 2023, after the area solution for power on the Utsira High comes on line, we expect that more than 40 per cent of the production will be operated this way. 

The NPD wants to ensure that all socio-economically profitable resources on the Shelf are produced. Therefore, it is important that the oil companies work to improve recovery from producing fields. The traditional methods are drilling more production wells and injection of water and gas to boost the pressure in the reservoir, and thus force out more oil and gas.

Time to test advanced methods

It’s also important that the companies work with more advanced methods. “Advanced methods to increase recovery have a significant potential and are being used in oil activities in countries in different parts of the world. Advanced methods have also been tested on the UK shelf, with good results. It’s definitely time for the oil companies to also test these kinds of methods on offshore fields here at home,” says Sølvberg.

A lot of oil and gas resources have been proven in tight reservoirs; in other words, reservoirs with low permeability. There are great opportunities for profitable production here if new technology and new solutions are applied.

The NPD’s most important task is to manage the petroleum resources so they create the greatest possible value for society. Half of the remaining resources have already been discovered. In this year’s resource report on fields and discoveries, we present facts and analyses to illustrate how we are working to increase the value of these resources.

Watch streaming, presentation of the resource report 2019 on discoveries and fields (in Norwegian)

 

 

Contact
Eldbjørg Vaage Melberg

Tel: +47 51 87 61 00

Updated: 07/10/2019

Latest news

Drilling permit for well 6608/1-1 S
15/08/2022 The Norwegian Petroleum Directorate (NPD) has granted PGNiG Norway Upstream AS drilling permit for well 6608/1-1 S, cf. Section 13 of the Resource Management Regulations.
Oil and gas discovery northeast of the Skarv field in the Norwegian Sea – 6507/3-15
12/08/2022 Aker BP ASA, operator of production licence 941, has concluded the drilling of wildcat well 6507/3-15.
NPD to present new resource report
04/08/2022 On Thursday, 25 August, Kjersti Dahle Grov, Director of Technology, Analysis and Coexistence, will present the Resource Report 2022.
Drilling permit for well 6507/8-11 S
03/08/2022 The Norwegian Petroleum Directorate (NPD) has granted Equinor Energy AS drilling permit for well 6507/8-11 S, cf. Section 13 of the Resource Management Regulations.
Dry well near the Brage field in the North Sea – 31/4-A-13 C
29/07/2022 Wintershall Dea Norge AS, operator of production licence 055, has concluded the drilling of wildcat well 31/4-A-13 C.
High level of activity on the Norwegian shelf in the first half of 2022
20/07/2022 50 years after the Storting (parliament) decided to establish the Norwegian Petroleum Directorate (NPD), there is still plenty of activity on the Norwegian shelf.
Production figures June 2022
20/07/2022 Preliminary production figures for June 2022 show an average daily production of 1 529 000 barrels of oil, NGL and condensate.
Drilling permit for well 31/1-3 S and 31/1-3 A
20/07/2022 The Norwegian Petroleum Directorate (NPD) has granted Equinor Energy AS drilling permit for well 31/1-3 S and 31/1-3 A, cf. Section 13 of the Resource Management Regulations.
Gas discovery near the Skarv field in the Norwegian Sea – 6507/2-6
13/07/2022 Aker BP ASA, operator of production licence 261, has concluded the drilling of wildcat well 6507/2-6.
Dry well near the Fenja field in the Norwegian Sea – 6306/3-2
11/07/2022 ConocoPhillips Skandinavia AS, operator of production licence 935, has concluded the drilling of wildcat well 6306/3-2.