Mapping offshore wind

havvinden

13/05/2022 The Ministry of Petroleum and Energy (MPE) has given the Norwegian Petroleum Directorate (NPD) an assignment to conduct surveys in connection with awarding acreage for offshore wind.

The NPD has been tasked with planning and implementing a tendering process for preliminary surveys in the areas of Sørlige Nordsjø II and Utsira Nord, which were opened for applications for renewable energy generation about 18 months ago.

These surveys will gather basic seismic, bathymetry and water column data. The Government is proposing an additional appropriation of NOK 65 million for the NPD over the revised national budget (RNB) for this assignment.

The procurement process is already under way. The plan is for the surveys to start as early as this summer.

The MPE is working to establish a framework for awarding acreage for offshore wind projects. The licensing process will ensure that the players that are awarded acreage will conduct a project-specific impact assessment once they have been given exclusive rights to the acreage.

Familiar with the shelf

The companies are expected to spend one to two years studying the impacts of the projects. The results from the NPD's mapping will be included in the basis for the impact assessments.

"We're very familiar with the geology on the Norwegian shelf and have extensive experience in collecting geophysical data. We're looking forward to embarking on this assignment," says Torgeir Stordal, the NPD's Director for Technology, Analysis and Coexistence.

Contact

Ola Anders Skauby

Director Communication, public affairs and emergency response

Tel: +47 905 98 519

Updated: 13/05/2022

Latest news

Dry well north of the Heidrun field in the Norwegian Sea – 6507/8-11 S
29/11/2022 Equinor Energy AS, operator of production licence 124, has concluded the drilling of exploration well 6507/8-11 S.
Correction of production figures October 2022
25/11/2022 NPD has made an adjustment to the preliminary gas-production figures for October.
Welcome to IEA Technical Collaboration workshops
10/11/2022 22. – 23. November: Research and experience on Enhanced Oil Recovery. 24. November: "Oil and gas in the context of energy security and transition".
Drilling permit for well 25/10-17 S
10/11/2022 The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 25/10-17 S, cf. Section 13 of the Resource Management Regulations.
Drilling permit for well 16/1-35 S
08/11/2022 The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 16/1-35 S, cf. Section 13 of the Resource Management Regulations.
All status reports are now on the FactPages and the FactMaps
04/11/2022 All available status reports (relinquishment reports) are now available on the FactPages.
Gas/condensate discovery near the Oseberg field in the North Sea
04/11/2022 OMV (Norge) AS, operator of production licence 1100, is in the process of concluding the drilling of exploration wells 30/5-4 S and 30/5-4 A.
Announcement: Acreage for CO2 storage on the Norwegian Continental Shelf
02/11/2022 On 2 November 2022, the Ministry of Petroleum and Energy announced an area for CO2 storage pursuant to the CO2 Storage Regulations.
Sharing data from older wells
31/10/2022 Production and injection data from older wellbores is now available in Diskos.
Impact assessment for mineral activity on the Norwegian continental shelf
27/10/2022 The impact assessment in connection with the opening process for seabed mineral activities is now being put forward for consultation, with a deadline for responses of 27 January 2023.