Webinar:Immiscible WAG modelling

EOR2

Improve IOR/EOR Competence

08/02/2021 Welcome to the second presentation from Arne Skauge, Energy Research Norway. This lecture will give a practical introduction to modelling of immiscible WAG processes. The key parameters will be defined, and their impact will be discussed in case study simulations. Join us on Feb. 17th.

Sign up here!

Updated: 08/02/2021

Latest news

Drilling permit for well 30/5-4 S
04/07/2022 The Norwegian Petroleum Directorate (NPD) has granted OMV (Norge) AS drilling permit for well 30/5-4 S, cf. Section 13 of the Resource Management Regulations.
Drilling permit for well 35/6-3 S
04/07/2022 The Norwegian Petroleum Directorate (NPD) has granted Neptune Energy Norge AS drilling permit for well 35/6-3 S, cf. Section 13 of the Resource Management Regulations.
Preparing Nova for start-up
30/06/2022 The authorities have granted consent to start production from the Nova field in the North Sea.
Drilling permit for well 25/7-10
28/06/2022 The Norwegian Petroleum Directorate (NPD) has granted ConocoPhillips Skandinavia AS drilling permit for well 25/7-10, cf. Section 13 of the Resource Management Regulations.
Drilling permit for well 6607/12-5
27/06/2022 The Norwegian Petroleum Directorate (NPD) has granted Equinor Energy AS drilling permit for well 6607/12-5, cf. Section 13 of the Resource Management Regulations.
Prestigious UN post for Harald Brekke
23/06/2022 Senior geologist Harald Brekke has been elected to the Commission on the Limits of the Continental Shelf (CLCS).
Production figures May 2022
21/06/2022 Preliminary production figures for May 2022 show an average daily production of 1 831 000 barrels of oil, NGL and condensate.
Dry well near the Kvitebjørn field in the North Sea – 34/9-1 S
21/06/2022 Equinor Energy AS, operator of production licence 1049, has concluded the drilling of wildcat well 34/9-1.
Ingrid Sølvberg resigns as Director General
17/06/2022 Sølvberg has today, Friday 17 June, resigned from her position as Director General for the Norwegian Petroleum Directorate.
Is the glass half-empty or half-full?
17/06/2022 There's no reason to sit back and rest on our laurels when an old field reaches tail production.