Extending lifetime on Sigyn
23/03/2017
The Norwegian Petroleum Directorate has granted consent for continued use of the subsea facilities on the Sigyn field in the North Sea from the end of 2017 until the end of 2022.
In its application, operator ExxonMobil refers to current estimates which indicate production until the end of 2022.
Sigyn’s subsea facilities comprise wells and a subsea template, a pipeline to Sleipner A, as well as an umbilical for controlling and monitoring of wells.
A new development well was drilled on Sigyn in 2016, which has contributed to the extended lifetime. The Sigyn field encompasses the deposits Sigyn Vest, which contains gas and condensate, and Sigyn Øst, which contains light oil. The field was developed with a subsea template connected to the Sleipner Øst platform. Production started in 2002.
Original oil deposits amounted to 1.2 million standard cubic metres (7.5 million barrels). Remaining oil to produce is estimated at 0.9 million standard cubic metres (5.6 million barrels). Out of the original gas reserves of 8 million standard cubic metres, about 1 million remains to produce.
The licensees in Sigyn are ExxonMobil with 40 per cent and Statoil with 60 per cent.
Relevant
Updated: 04/12/2023
Latest news
The gas bank in the Barents Sea
08/12/2023
Analyses show that the Barents Sea contains significant resources, probably more gas than oil. What needs to be done if Norway is to supply Europe with the requested volumes of gas?
Plenty of potential in tight reservoirs
06/12/2023
There are vast proven gas resources on the Norwegian shelf which are currently without development plans. Much of this gas is located in tight reservoirs – which makes it difficult to produce.
Drilling permit for well 7219/6-1
06/12/2023
The Norwegian Petroleum Directorate (NPD) has granted Vår Energi AS drilling permit for well 7219/6-1 in production licence 1025 S, cf. Section 13 of the Resource Management Regulations.
Valuable gas resources untouched
05/12/2023
The Norwegian Petroleum Directorate (NPD) has conducted a mapping of gas resources that, for various reasons, have yet to be developed. Several of these discoveries could be produced in a manner that is profitable from a socio-economic perspective.
Drilling permit for well 15/9-25
30/11/2023
The Norwegian Petroleum Directorate (NPD) has granted Harbour Energy Norge AS drilling permit for well 15/9-25 in production licence 1138, cf. Section 13 of the Resource Management Regulations.
Production figures October 2023
21/11/2023
Preliminary production figures for October 2023 show an average daily production of 1 981 000 barrels of oil, NGL and condensate.
Name change for the NPD
16/11/2023
The Norwegian Petroleum Directorate (NPD) is changing its name to the Norwegian Offshore Directorate as of 1 January 2024. The new name reflects the additional responsibilities assigned to the directorate in recent years.
Drilling permit for well 35/11-28 S
16/11/2023
The Norwegian Petroleum Directorate (NPD) has granted Equinor Energy ASA drilling permit for well 35/11-28 S in production licence 248 C, cf. Section 13 of the Resource Management Regulations.
Drilling permit for well 35/6-4 A
15/11/2023
The Norwegian Petroleum Directorate (NPD) has granted Neptune Energy Norge AS drilling permit for well 35/6-4 A in production licence 929, cf. Section 13 of the Resource Management Regulations.