Oljedirektoratet

Streamlined template for Annual status report for fields in production

nyhetsbilder_od13(2)

02/07/2020 The template for the annual status report (ASR) for fields in production from 2019 to 2020 has been simplified. Starting from 2020, ASR for fields in production must be submitted to the NPD by 15 October.

“It will now be easier to report data to the Annual status report (ASR) for fields in production. This is a first step towards full digitalisation of the ASR reporting,” says Tove Francke, Assistant director Development and operations - Norwegian Sea.

Simpler and more efficient

Until now, ASR has been based on filling in a form in Word, which has been quite extensive. Part of the status reporting will now be done in Excel. Some tables have been removed, others have been simplified and the scope of the information that must be addressed has been reduced.

The objective is to ensure the process becomes simpler and more efficient for both the companies and the Norwegian Petroleum Directorate.

“Reporting data in Excel will make it easier to digitalise and compare data for purposes such as field and portfolio analyses by the authorities and the licensees,” says Francke.

Concurrent deadlines

Starting from 2020, ASR for fields in production must be submitted to the NPD by 15 October, ref. amendment to Section 47 of the Regulations to the Act relating to Petroleum Activities which came into force on 1 February 2020. This has a concurrent deadline with reporting for the Revised National Budget (RNB). Coordinating these reporting deadlines will ensure a closer link between RNB and ASR.

Among other things, ASR is an important basis for the authorities’ assessment of applications for production permits. The Guidelines for production permits are currently being revised, with an estimated publication date within October this year. The work load will be reduced and reporting will be simplified by a closer link between RNB, ASR and production permit applications.

Important practical information

The Guidelines for ASR2020 for fields in production with attached Excel file will be available on our website during the month of August.

ASR with attached long-term plan must be submitted together via e-mail to the NPD by 15 October 2020: postboks@npd.no

 

Contact
Tomas Mørch

Tel: +47 51 87 63 33

Tove Francke

Tel: +47 51 87 64 18

Updated: 04/12/2023

Latest news

The gas bank in the Barents Sea
08/12/2023 Analyses show that the Barents Sea contains significant resources, probably more gas than oil. What needs to be done if Norway is to supply Europe with the requested volumes of gas?
Plenty of potential in tight reservoirs
06/12/2023 There are vast proven gas resources on the Norwegian shelf which are currently without development plans. Much of this gas is located in tight reservoirs – which makes it difficult to produce.
Drilling permit for well 7219/6-1
06/12/2023 The Norwegian Petroleum Directorate (NPD) has granted Vår Energi AS drilling permit for well 7219/6-1 in production licence 1025 S, cf. Section 13 of the Resource Management Regulations.
Valuable gas resources untouched
05/12/2023 The Norwegian Petroleum Directorate (NPD) has conducted a mapping of gas resources that, for various reasons, have yet to be developed. Several of these discoveries could be produced in a manner that is profitable from a socio-economic perspective.
Drilling permit for well 15/9-25
30/11/2023 The Norwegian Petroleum Directorate (NPD) has granted Harbour Energy Norge AS drilling permit for well 15/9-25 in production licence 1138, cf. Section 13 of the Resource Management Regulations.
Production figures October 2023
21/11/2023 Preliminary production figures for October 2023 show an average daily production of 1 981 000 barrels of oil, NGL and condensate.
Name change for the NPD
16/11/2023 The Norwegian Petroleum Directorate (NPD) is changing its name to the Norwegian Offshore Directorate as of 1 January 2024. The new name reflects the additional responsibilities assigned to the directorate in recent years.
Drilling permit for well 35/11-28 S
16/11/2023 The Norwegian Petroleum Directorate (NPD) has granted Equinor Energy ASA drilling permit for well 35/11-28 S in production licence 248 C, cf. Section 13 of the Resource Management Regulations.
Drilling permit for well 35/6-4 A
15/11/2023 The Norwegian Petroleum Directorate (NPD) has granted Neptune Energy Norge AS drilling permit for well 35/6-4 A in production licence 929, cf. Section 13 of the Resource Management Regulations.
First offshore wind data sets available in Diskos
13/11/2023 The Norwegian Petroleum Directorate (NPD) has collected and prepared the first data sets for offshore wind on the Norwegian shelf.